X-178 115V Line, built in 1948-9 and one section “upgraded” in 1986
Listed as cancelled in June 2023 Asset Condition Project list.
Campton, Thornton and Woodstock DRAFT proposed construction plans
North Woodstock to Sugar Hill DRAFT proposed construction plans
Sugar Hill, Bethlehem, Dalton, Whitefield DRAFT proposed construction plans
2023: Inspection/Treatment tags on 1948 section of line
drone image X-178 july 3, 2023
drone image x-178 no road july 3, 2023
May 2023 letter to ISO re X-178 and Asset Condition problem
June 2023 questions for Eversource
5-24-2-23 response to Eversource answers to questions
May 2023 questions for Eversource
4-22-2023: "Dear Neighbor" letter
Project Fact Sheet sent to landowners claiming reliability
Eversource valuation of ROW and infrastructure in Easton, 2022
2018, October 17; PAC submission, replace 56 structures out of 570 at $11.2 million
2017 river crossing application, no mention of pole condition problems.
circa 2017 crossbar and insulator replacement
2016: Bog Pond Scenic Area proposal rejected by WMNF
2016: Bog Pond Scenic Area procedural history
2015: "load has not required upgrade of remaining [336,400 circular mils] lines"
2013: Northern Pass and WMNF Special Use Permit requirements
NP Special Use Permit info. for WMNF with map showing where Eversource has no ROW
found poem; Muntz WMNF special use permit application
Bog Pond area looking toward Old Kinsman Notch
Bog Pond area with poles dumped in 1986 "upgrade"
4-14-23: "Confidential" Project information sent with the email above.
Pesticides used on ROW until 1985
1986 'upgrade' paid for by Hydro-Quebec
Forest Service denies PSNH special use permit 1970
1945: Forest Service suggests Bog Pond rather than Coppermine Trail