E-115 115kV Line $64 million
Long road
Wetland matting
Stay away sign
Road and wetlands matting on ROW and new structures, conductor and OPGW
New pole in water
Large truck hauling flatbed on wetland matting and road in ROW.
Two new poles in water
Excavator, gravel truck and other heavy machinery on ROW
start of construction letter
project maps
2023, March; request to NEPOOL for TCA
2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.
2022: Final TCA E-115
road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor
January 2022, license granted
january 2022, staff recommendation
2022: Eversource Transmission Cost Allocation application
October 2022 PAC presentation, local system plan
2021:order of notice
December 2021, petition attachment, 12/2016 original date, pole heights 52'-106'
July 2021 no impact from interconnection
2017 river crossings, no mention of pole degradation
2015: "The load and added local generation in this area has not required the upgrading of either line."
crossing
asset condition projects