E-115 115kV Line $64 million

Long road

Wetland matting

Stay away sign

Road and wetlands matting on ROW and new structures, conductor and OPGW

New pole in water

Large truck hauling flatbed on wetland matting and road in ROW.

Two new poles in water

Excavator, gravel truck and other heavy machinery on ROW

2023, March; request to NEPOOL for TCA

2022, October 19; PAC presentation

2022, June 27: Final TCA E-115

road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor

2022, June 23; start of construction letter

2022, May 12; project maps

2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.

January 2022, license granted

january 2022, staff recommendation

2022: Eversource Transmission Cost Allocation application

2021: order of notice

December 2021, petition attachment, 12/2016 original date, pole heights 52'-106'

July 2021 no impact from interconnection

2017 river crossings, no mention of pole degradation

2015: "The load and added local generation in this area has not required the upgrading of either line."

crossing

asset condition projects