• skip to content

NH Conservation

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
Trace: • forest_management • nash_stream_citizens_committee • accident_reports_and_enforcement • mountain_and_northern_branches • portsmouth_branch • trail_closures_and_complaints • r-193 • west_side_and_bordeau_trails • washington_name_change • lines

lines

This is an old revision of the document!


Table of Contents

  • Asset Condition Lines
  • 345kV
    • 115kV Lines

Asset Condition documents

Grid Maps

Asset Condition Lines

345kV

307 $9.4 m.

326 $6 m.

367 $15.2 m.

373 $10 m.

379 $8. m.

380

385 45 m.

391 $17.8 m. and $9 m.

115kV Lines

A-111 $53 m.

A-126 $8.4 m.

A-152 $6.9 m.

B-112 $105 m.

B-143 $17.3

C-129 $12 m.

C-189 $12.8 (phase 3)

C-196 $6.2 m.& $11.7 m. & 14.8 m.

D-108 $6.7 m.

D-121 $5 m.

D-142

E-115- $64 m.

E-194 $8.7 m.

F-139 $58 m.

G-128 Phase 1: 47 m.

G-146 $58 m. (phase 3)

G-192

H-123 $5.8 m.

H-137 $7.8 m. (phase 3)

H-141 $9.4 m. $19 m. (phase 3)

I-158 $28.6 m. (phase 3)

J-114 $9.7 m.

K-105 phase 1: $4.1 m.

K-165

K-174 $16.2 m.

L-163 $17 m.

L-175 phase 1: $3.8 m.

M-108/V-182 $13.4 m. (phase 3)

M-127 $29.7 m.

M-164 $6 m.

M-183 $6 m.

O-154 $51 m.

P-106 $5.6 m.

P-145 $52 m.

Q-171 $15 m.

Q-195 $100 m.

R-169 $8.4 (phase 3)

R-187 $7.5 m.

R-193 $7.7 m.

S-136 $6.2 m.

S-153 $5 m.

S-188 $7.3 m.

T-198 $19 m.

U-181 $8.5 m.

U-199 $51 m.

V-182 $33. m (phase 3

V-191 $10 m. )

W-179

X-104] $7 m.] [[X-116|X-116 $24.6

X-178 $11 m. project dropped and replaced with $50 m.project

Y-138 $8.5 m.

Z-119 $23.4 m. phase 1

Z-180 $14.5 m.

lines.1692354421.txt.gz · Last modified: 2023/08/18 11:27 by sigridundset

Page Tools

  • Show pagesource
  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki