This is an old revision of the document!
B-143 115kV line
2023, May 18, presentation to PAC, replace 46 out of 154 structures and reconductor with Optical Ground Wire (OPGW); $17.3 million
map showing line location
19-146_2019-09-04_eversource_petition_crossing_baboosic.pdf
19-146_2019-11-07_staff_recommendation.pdf
December 2019, 2020-2023 revisions PAC presentation
Same as above but "clean"
b143_map_and_drawings.pdf