391 345kV Line
2023, May 18, presentation to PAC, replace 39 out of 335 structures; $12.4 million
2022, August 19; Alteration of Terrain DES approval and waiver letter 391, 373, 385
2022, June 15 presentation to PAC, replace 27 out of 345 poles; $9. million for 391 line
2022, June 1; Alteration of Terrain application 391 line.
2022, April, Alteration of Terrain Plans, 391, 373, 385
2022, May; Alteration of Terrain drawings, 391, 373, 385
delineated wetland under 391, "upgrade"
delineated wetland under 391, wetlands are not an asset, 'for' Eversource.
delineated wetland under 391, "upgrade"
2020, January 20; Surface and Groundwater overlay plans
2020: Start of Construction form
2020, April 3; DES permission to Alter the Terrain, with waivers
2019, July 1 Start of Construction form
2019, June 28; DES permission to Alter Terrain, with waivers, 391, 373, 385
2019, May; Alteration of Terrain permit application
2019, April 24; Alteration of Terrain plans for structure replacements 391, 373, 385
2017, December presentation to PAC, replacement of 69 out of 335 poles; $19.6 million