User Tools

Site Tools


r-193

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
r-193 [2023/08/26 09:01]
sigridundset
r-193 [2023/08/27 10:44] (current)
sigridundset
Line 6: Line 6:
  
 {{ :a126:aot-2412_plans.pdf |2023, June 16: Alteration of Terrain plans}} {{ :a126:aot-2412_plans.pdf |2023, June 16: Alteration of Terrain plans}}
 +
 +{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}
  
 {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 30 out of 177 structures; $7.7 million}} {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 30 out of 177 structures; $7.7 million}}
Line 14: Line 16:
  
 {{ ::oct_17_2018_seven_115kv_asset_conditions_lines_partial.pdf |2018, October 17, presentation to PAC, replace 49 structures, $8.3 million}} {{ ::oct_17_2018_seven_115kv_asset_conditions_lines_partial.pdf |2018, October 17, presentation to PAC, replace 49 structures, $8.3 million}}
- 
-{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 3o out of 177 structures; $7.7 million}} 
  
 {{ :may_18_2023_e_pac_lines_map.png?linkonly |map of line location}} {{ :may_18_2023_e_pac_lines_map.png?linkonly |map of line location}}
r-193.1693036906.txt.gz · Last modified: 2023/08/26 09:01 by sigridundset