User Tools

Site Tools


r-193

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
r-193 [2023/08/15 15:21]
sigridundset
r-193 [2023/08/27 10:44] (current)
sigridundset
Line 1: Line 1:
 +
 R-193 115kV line R-193 115kV line
  
-{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 3o out of 177 structures; $7.7 million}}+ 
 +{{ :a126:aot-2412_permit_rm.pdf |2023, June 27: Alteration of Terrain permit with waivers}} 
 + 
 +{{ :a126:aot-2412_plans.pdf |2023, June 16: Alteration of Terrain plans}} 
 + 
 +{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}} 
 + 
 +{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 30 out of 177 structures; $7.7 million}} 
 + 
 +{{ ::2023_05_18_meeting_minutes_final.pdf |2023 may 18 PAC minutes}} 
 + 
 +{{ ::a126:aot-2412_miscellaneous_r.pdf |2023, May 5: cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."}} 
 + 
 +{{ ::oct_17_2018_seven_115kv_asset_conditions_lines_partial.pdf |2018, October 17, presentation to PAC, replace 49 structures, $8.3 million}}
  
 {{ :may_18_2023_e_pac_lines_map.png?linkonly |map of line location}} {{ :may_18_2023_e_pac_lines_map.png?linkonly |map of line location}}
r-193.1692109280.txt.gz · Last modified: 2023/08/15 15:21 by sigridundset