User Tools

Site Tools


q-195

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
q-195 [2023/06/14 14:23]
sigridundset
q-195 [2023/08/15 16:04] (current)
sigridundset
Line 1: Line 1:
 Q-195 115kV line Q-195 115kV line
  
-{{ ::b112-u199-q195_rebuild_presentation.pdf |Line rebuild presentation}}+{{ ::2023_05_18_meeting_minutes_final.pdf |2023 May 18 PAC minutes, Replace 224 wood structures with 223 new steel structures, Re-conductor 17.5 miles of 336/477/795 ACSR with 1272 ACSS, Install 35 miles of OPGW (2 x 17.5 mi, Estimated PTF Cost: $100.00M (-25% / +50%), Projected In-service Date: Q4, 2026}} 
 + 
 +{{ ::b112-u199-q195_rebuild_presentation.pdf |2023, May 18 presentation to PAC}}
  
 {{ :2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossing poles fine }} {{ :2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossing poles fine }}
q-195.1686749020.txt.gz · Last modified: 2023/06/14 14:23 by sigridundset