Q-195 115kV line | Q-195 115kV line |
| |
{{ ::b112-u199-q195_rebuild_presentation.pdf |Line rebuild presentation}} | {{ ::2023_05_18_meeting_minutes_final.pdf |2023 May 18 PAC minutes, Replace 224 wood structures with 223 new steel structures, Re-conductor 17.5 miles of 336/477/795 ACSR with 1272 ACSS, Install 35 miles of OPGW (2 x 17.5 mi, Estimated PTF Cost: $100.00M (-25% / +50%), Projected In-service Date: Q4, 2026}} |
| |