 M-108 aka V-182 Not on June 2023 Asset Condition List M-108 aka V-182 Not on June 2023 Asset Condition List
 +
 +{{ ::g-146_and_m-108.pdf |2023, February 13: Pembroke CC minutes: "replacement of 65 existing wooden pole structures with significantly larger weathered-steel structures...Roads through these easements will require significant improvement, including the permanent placement of gravel along the roadbed...Additionally, 100’x100’ gravel work pads will be constructed at each pole location. After completion of the project 60’x30’ pads will be left at each of these sites."}}
 +
 +{{ ::c-189_g146_h137_m108_maps.pdf |August 2, 2023 project maps}}
 +
 +{{ :v182:aot2376_rm.pdf |2023, May 22: DES permission to Alter Terrain, with waivers}}
 +
 +{{ :v182:aot-2388_nhfg_conditions.pdf |2023, March 23: New Hampshire Fish & Game conditions}}
  
 {{ ::1-cre-2022-009-petition.pdf |2022: petition}} {{ ::1-cre-2022-009-petition.pdf |2022: petition}}
Line 11: Line 19:
 {{ ::cre-2022-009-order-of-notice.pdf |2022: order of notice}} {{ ::cre-2022-009-order-of-notice.pdf |2022: order of notice}}
  
-{{ ::g-146_and_m-108.pdf |2023, February 13: Pembroke CC minutes: "replacement of 65 existing wooden pole structures with significantly larger weathered-steel structures...Roads through these easements will require significant improvement, including the permanent placement of gravel along the roadbed...Additionally, 100’x100’ gravel work pads will be constructed at each pole location. After completion of the project 60’x30’ pads will be left at each of these sites."}}+{{ :v182:aot2388_rm.pdf |}}
  
-{{ ::c-189_g146_h137_m108_maps.pdf |August 22023 project maps}}+{{ :v182:aot_stamped.pdf |2022, September 8: first page Alteration of Terrain, stamped}} 
 + 
 +{{ :v182:aot_stamped-3.pdf |2022May 13; first page Alteration of Terrain, stamped}} 
 + 
 +{{ ::v182-f139-project-fact-sheet.pdf |project fact sheet}} 
 + 
 +{{ :05.10.2023.pdf |2022, May 10: Concord Conservation Commission}} 
 + 
 +{{ :eversource_franklin_northfield_canterbury_concord_des_wetlands_rfmi_5.13.23.pdf |May 2023: DES Dredge and Fill permit}} 
 + 
 +{{ ::v182:aot2209_rm.pdf |}} 
 + 
 +{{ :v182:aot_stamped-5.pdf |}} 
 + 
 +{{ :v182:m108_v182_puc.pdf |}} 
 + 
 +{{ :v182:transmittal_final_documents_re_external_v182_f139_transmission_line_rebuild_project.pdf |}} 
 + 
 +{{ :v182:transmittal_of_final_documents_re_external_v182_transmission_line.pdf |}} 
 + 
 +{{ ::np_v182_f139.pdf |2016: Northern Pass F-139 and V-182}}
  
  