l-163

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
l-163 [2023/06/14 08:39]
sigridundset created
l-163 [2023/08/21 08:01] (current)
sigridundset
Line 1: Line 1:
-L-153 115kV line+L-163 115kV line 
 + 
 + 
 + 
 +{{ ::de-20-211.pdf |2021: crossing permit}} 
 + 
 +{{ ::a5_eversource_copper_conductor_and_shield_wire_replacement_project.pdf |January 2021 PAC presentation}} 
 + 
 +{{ ::l-163_2019_linnet_stays_crossing_keene_stoddard_sullivan.pdf |2019; crossing, conductor not replaced, stays at 336}} 
 + 
 +{{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17; PAC submission, replace 64 structures at $14. million}}
  
  
-{{ ::e_22018-9_115kv_pac_submissions.pdf |2018 PAC submission}} 