• skip to content

NH Conservation

User Tools

  • Log In

Site Tools

  • Recent Changes
  • Media Manager
  • Sitemap
Trace: • dot_road_crossing_permits_for_other_ohrv_trails • 12-2-2021_91-a_berlin_line • mt._washington_commission_minutes • dot_road_crossing_permits_for_ride_the_wilds • pac_agendas_and_minutes • the_nash_stream_s.f._easement_terms_and

the_nash_stream_s.f._easement_terms_and

This is an old revision of the document!


Pertinent documents on the definition of snowmobile and OHRV

1996: BOT to F&G; no OHRVs allowed on Keene area Rail Trail.

2- 13-2007: FHWA to NH DOT; no OHRVs on TE-funded Rail Trails because they are not snowmobiles

2-13-2007: FHWA to NH DOT; no OHRVs p. 2

2007: DRED to NH DOT;

dred_to_dot_p._2.jpg

dred_to_dot_p.3.jpg

2007: BOT does not concur with FHWA

2007; BOT concurs with FHWA

2007: DRED opposes use of TE funds for rail purchases.

the_nash_stream_s.f._easement_terms_and.1645961415.txt.gz · Last modified: 2022/02/27 11:30 by sigridundset

Page Tools

  • Show pagesource
  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki