This is an old revision of the document!
Rail Trails
List of all DOT rail and funding. TE funded rail lines do not allow OHRV use unless the FHWA approves a waiver.
TE- funding status report; up to 2009
2004: 91-a to DRED rail trails
2005: NH State Rails Plan
2006: 91-a DRED re Jericho, ATV survey, STAC minutes
2007: 91-a to DRED re. Rail Trail funding and permitted uses.
2007: 91-a to DOT re rail trails. The Bureau of Trails "would oppose future TE-funded project on rail trails."
2007: Bike Walk Alliance of NH 'ATVs in New Hampshire'.
2008: ATV Watch, A Critical Decision
Undated BOT Rail Trail Brochure
Presidential Rail Trail Management Plan
12-2021 91-a: Rail Trail crossing at Industrial Park Road, Littleton.
12-2-2021 91-a to DOT for “information on the all Rail lines/trails, including funding, deeds, motorized/non-motorized status and grant applications.” Blackmount; Haverhill
Ashuelot Line
Cheshire Branch Line
Berlin Line
Concord to Corridor
Concord to Claremont Branch
Coos, Farmington, Fremont and Fort Hill Branches
Conway and Goffstown Branches
Hillsboro, Lakeport and Manchester to Lawrence Branches
Mountain and Monadnock Branches
North Stratford and Beecher's Falls Branches
Northern Branch
Worcester, Nashua and Wolfoboro Branches
Portsmouth Branch
Laconia, Lincoln, Bridges and Misc.