R-187 115kV line
a2_eversource_laminated_wood_structure_replacements_phase_2_rev1_redline.pdf
2021, December 1; crossing granted
2021, October 20; PAC submission, replace 31 out of 31 structures, $7.5 m.
2021, September 21; staff recommendation
pole in good condition being cut down
good condition labeled felled pole
very long good condition pole on trucked in gravel pad
pole pile on trucked in gravel pad