This is an old revision of the document!
R-187 115kV line
2021, December 1; crossing granted
2021, October 20; PAC submission, replace 31 out of 31 structures, $7.5 m.
2021, September 21; staff recommendation
pole in good condition being cut down
pole in good condition laying on altered terrain
good condition labeled felled pole