A-152 115kV line

2022, March 28, DES permission to alter terrain, with waivers

2022, February 8: Stamped Alteration of Terrain plans

aot-2120_plans.pdf

January 2022, license granted

2022,January; Structure replacement and OPGW Alteration of Terrain Plans

October 2021 PAC submission, laminated wood phase 2 revision 1 replace 72 out of 242 structures at $15.3 m.

2021 petition, following 2008 and 2019 petitions

December 2021 staff recommendation,steel poles 65'-79'

November 2021 crossing petition, wood to steel

November 2021 Keene Conservation Commission

September 2021 exhibits dated December 2016

September 2020 order granting crossings

2018, October 17; PAC submission, replace 29 structures at $6.1. million

a-152.1693038254.txt.gz · Last modified: 2023/08/26 08:24 by sigridundset

Page Tools

  • Show pagesource
  • Old revisions
  • Backlinks
  • Back to top
Donate Powered by PHP Valid HTML5 Valid CSS Driven by DokuWiki