This is an old revision of the document!
Alteration of Terrain
2023, June 27: Alteration of Terrain permit with waivers
2023, June 16: Alteration of Terrain plans
2023, May 18, presentation to PAC, replace 35 out of 182 structures; $8.4 million
2023 may 18 PAC minutes
2018, October 17, presentation to PAC, replace 49 structures, $8.3 million