This is an old revision of the document!
Alteration of Terrain
Alteration of Terrain permit
Alteration of Terrain plans
2023, May 18, presentation to PAC, replace 35 out of 182 structures; $8.4 million
2023 may 18 PAC minutes
2018, October 17, presentation to PAC, replace 49 structures, $8.3 million