A-111 115kV transmission line
Application to ISO for TCA. Rebuilding line at the same size is not presented as an alternative. No pole inspections submitted. Described as reliability and asset condition project
March 3, 2022 New Hampton Selectboard minutes. E$ wants work to be allowed 7 days a week, 7:00 am to 7:00 pm. Dump trucks are delivering gravel for road building and there will be drilling.
Wetland matting
Stay away sign
Road and wetlands matting on ROW and new structures, conductor and OPGW
New pole in water
Large truck hauling flatbed on wetland matting and road in ROW.
Two new poles in water
Bulldozer on ROW
December 2020 Asset Condition PAC presentation
Project construction fact sheet citing reliability
2017 river crossings, no mention of pole degradation
2015: "The load and added local generation in this area has not required the upgrading of either line."
Final TCA, $33. m.
Final TCA Z-180
October 2019 PAC presentation. A-111 listed as Asset Condition, not reliability project.
Project Construction Fact Sheet
April 2021 submission to SEC claiming new, larger, taller, steel line is a one-for-one replacement
October 2022 PAC presentation, local system plan
2021, order of notice
October 2021, crossing license
November 2020, petition for amended license
March 2023 request to NEPOOL for TCA
2021 ISO determination of no problems with interconnection
January 2022, license granted
December 2021, staff recommendation