[[asset conditions documents| Asset Condition documents]] [[Grid Maps|Grid Maps]] ====== Asset Condition Lines ====== ====== 345kV ====== [[307|307 $9.4 m.]] [[326|326 $6 m.]] [[367|367 $15.2 m.]] [[373|373 $10 m.]] [[379|379 $8. m.]] [[381|380]] [[385|385 45 m.]] [[391|391 $17.8 m. and $9 m.]] [[1132|1132]] [[1505|1505]] [[3403|3403 $8.4 m.(Phase 2)]] ===== 115kV Lines ===== [[A-111|A-111 $53 m.]] [[A-126|A-126 $8.4 m.]] [[A-152|A-152 $6.9 m.(Phase 2)]] [[B-112 |B-112 $105 m.]] [[B-143|B-143 $17.3 ]] [[C-129|C-129 $12 m.]] [[C-189|C-189 $12.8 (phase 3)]] [[C-196|C-196 $6.2 m.& $11.7 m. & 14.8 m.]] [[D-108|D-108 $6.7 m.]] [[D-121|D-121 $5 m.]] [[D-142|D-142 $59 m.]] [[E-115|E-115- $64 m.]] [[E-194|E-194 $8.7 m.]] [[F-139|F-139 $58 m.]] [[G-128|G-128 Phase 1: 47 m.]] [[G-146|G-146 $58 m. (phase 3)]] [[G-192|G-192]] [[H-123|H-123 $5.8 m.]] [[H-137|H-137 $7.8 m. (phase 3)]] [[H-141|H-141 $9.4 m. $19 m. (phase 3)]] [[I-158|I-158 $28.6 m. (phase 3)]] [[J-114|J-114 $9.7 m.]] [[K-105|K-105 phase 1: $4.1 m.]] [[K-165|K-165]] [[K-174|K-174 $16.2 m.]] [[L-163|L-163 $17 m.]] [[L-175|L-175 phase 1: $3.8 m.]] [[M-108|M-108/V-182 $13.4 m. (phase 3)]] [[M-127|M-127 $29.7 m.]] [[M-164|M-164 $6 m. (Phase 2)]] [[M-183|M-183 $6 m.]] [[O-154|O-154 $51 m.]] [[P-106|P-106 $5.6 m.]] [[P-145|P-145 $52 m.]] [[Q-171|Q-171 $15 m.]] [[Q-195|Q-195 $100 m.]] [[R-169|R-169 $8.4 (phase 3)]] [[R-187|R-187 $7.5 m. (phase 2)]] [[R-193|R-193 $7.7 m.]] [[S-136|S-136 $6.2 m.]] [[S-153|S-153 $5 m.]] [[S-188|S-188 $7.3 m. (phase 2)]] [[T-198|T-198 $19 m.]] [[U-181|U-181 $8.5 m.]] [[U-199|U-199 $51 m.]] [[V-191|V-191 $10 m.]] [[W-171|W-179]] [[X-104|X-104 $7 m.]] [[X-116|X-116 $24.6]] [[X-178|X-178 $11 m. project dropped and replaced with $50 m.project]] [[Y-138|Y-138 $8.5 m.]] [[Z-119|Z-119 $23.4 m. phase 1]] [[Z-180|Z-180 $14.5 m.]]