H-141 115kV line {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} {{ ::petition_h-141.pdf |petition}} {{ ::1-cre-2023-008-crossing_application.pdf |2023 crossing application}} {{ ::2-cre-2023-008-exhibits_1_to_6.pdf |2023 exhibits}} {{ ::3-cre-2023-008-energy-staff-recommendation.pdf |2023 staff recommendation}} {{ ::4-cre-2023-008-license.pdf |2023 license}} {{ ::5-cre-2023-008-license-revision_memo.pdf |2023 license revision memo}} {{ ::6-cre-2023-008-revised-license.pdf |2023 revised license}} {{ :a126:aot-2412_permit_rm.pdf |2023, June 27: Alteration of Terrain permit with waivers}} {{ :a126:aot-2412_plans.pdf |2023, June 16: Alteration of Terrain plans}} {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 35 out of 182 structures; $8.4 million}} {{ ::2023_05_18_meeting_minutes_final.pdf |2023 may 18 PAC minutes}} {{ ::a126:aot-2412_miscellaneous_r.pdf |2023, May 5: cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."}} {{ ::oct_17_2018_seven_115kv_asset_conditions_lines_partial.pdf |2018, October 17, presentation to PAC, replace 49 structures, $8.3 million}} {{ ::7192018_notice_of_decision-eversource.pdf |notice of decision ES}} {{ ::cr-2021-011-eversource-crossing-order-of-notice.pdf |2021 crossing order of notice}} {{ ::eversource_permit-by-notification-030921.pdf |ES permit by notification}} {{ ::h141-2021-336_conductor_stays-crossing--recommendation.pdf |2021 crossing recommendation}} {{ ::h141_conductor_not_changed.pdf |September 2021, intra-department communication}} {{ :a5_115kv_structure_replacement_and_asset_conditions_multiple_lines.pdf |October 2018 PAC presentation}} {{ ::h-141_2023.pdf |2023 Danville Planning Board: "The structure replacements were selected based on site visit evaluations conducted by Eversource and must be replaced for the transmission line to continue to function safely and reliably."}} {{ ::may_meeting_packet.pdf |May 2019 Exeter Conservation Commission meeting packet}} {{ ::october_7_2021.pdf |October 2021 Brentwood planning board minutes}} {{ ::petition-att.pdf |petition}} {{ ::recommendation.pdf |recommendation}} {{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17; PAC submission, replace 44 structures at $7.7 million}}