x-178 [2023/08/12 10:33]
sigridundset
x-178 [2023/08/22 10:08] (current)
sigridundset
Line 1: Line 1:
-X-178 115V Line, built in 1948 and one section "upgraded" in 1986+X-178 115V Line, built in 1948-9 and one section "upgraded" in 1986
  
-{{ ::x178-1-draft-map-set.pdf |Campton, Thornton and Woodstock DRAFT proposed construction plans}}+Listed as cancelled in June 2023 Asset Condition Project list.
  
-{{ ::x178-2-draft-map-set.pdf |North Woodstock to Sugar Hill DRAFT proposed construction plans}}+{{ ::x178-1-draft-map-set.pdf |2023, August 1; Campton, Thornton and Woodstock DRAFT proposed construction plans}}
  
-{{ ::x178-3-draft-map-set.pdf |Sugar Hill, Bethlehem, Dalton, Whitefield DRAFT proposed construction plans}}+{{ ::x178-2-draft-map-set.pdf |2023, August 1; North Woodstock to Sugar Hill DRAFT proposed construction plans}}
  
-{{ ::dji_0299.jpg?linkonly |drone image X-178 july 32023}}+{{ ::x178-3-draft-map-set.pdf |2023, August 1; Sugar Hill, Bethlehem, Dalton, Whitefield DRAFT proposed construction plans}}
  
-{{ ::dji_0313.jpg?linkonly |drone image x-178 no road july 3, 2023}}+{{ ::tags_sh_1948_x-178.jpg?linkonly |2023, Inspection/Treatment tags on 1948 section of line}}
  
-{{ :x178:bog_pond_from_south_kinsman_before_powerlines.jpg?linkonly |Bog Pond from South Kinsman before powerline}}+{{ ::dji_0299.jpg?linkonly |2023, July 3; drone image X-178 }}
  
-{{ ::1945_fs_suggests_bog_pond.pdf |1945: Forest Service suggests Bog Pond rather than Coppermine Trail}}+{{ ::dji_0313.jpg?linkonly |2023, July 23; drone image x-178 no road }}
  
-{{ ::1970_fs_denies_psnh_sup_bog_pond.pdf |Forest Service denies PSNH special use permit 1970}}+{{ :x178:letter_to_iso_re_x-178_line_and_asset_condition_5-2023.pdf |2023, May letter to ISO re X-178 and Asset Condition problem}}
  
-{{ :x178:psnh_pesticides_on_row.pdf |Pesticides used on ROW until 1985}}+{{ :x178:questions_for_eversource_re_proposed_x-178_upgrade_6_2023.pdf |2023, June; questions for Eversource}}
  
-{{ ::psnh_upgrade_x-178.pdf |1986 'upgrade' paid for by Hydro-Quebec}}+{{ :x178:response_to_eversource_x-178_5_24_2023.pdf |2023, May 24;  response to Eversource answers to questions}}
  
-{{ ::northern_pass_and_the_white_mountain_national_forest_5-22-2013.pdf |2013: Northern Pass and WMNF Special Use Permit requirements}}+{{ :x178:questions_for_eversource_re_proposed_x-178_upgrade_5_2023.pdf |2023, May; questions for Eversource}}
  
-{{ :x178:wmnf_sup_exhibitsabcd.pdf |NP Special Use Permit info. for WMNF with map showing where Eversource has no ROW}}+{{ ::img_20230429_072844702.jpg?linkonly |2023, May; photo of line}}
  
-{{ ::muntz_poem.pdf |found poem; Muntz WMNF special use permit application}}+{{ ::x178:x178_project-introduction-letter.pdf |2023, April 22: "Dear Neighbor" letter}}
  
-{{ :x178:bog_pond_looking_toward_notch.jpg?linkonly |Bog Pond looking toward notch}}+{{ :x178:x178_project-fact-sheet.pdf |2023, April; Project Fact Sheet sent to landowners claiming reliability}}
  
-{{ :x178:bog_pond_with_dumped_poles.jpg?linkonly |Bog Pond area with poles dumped in 1986 "upgrade"}}+{{ ::4-14-23_e_to_easton_.png?linkonly |2023, April 14; E$ to Easton: "The only request at this point in time is keeping it to municipal staff only while we complete additional outreach to the towns along this line from Campton up to Whitefield.'}}
  
-{{ :x178:bpg_pond_looking_toward_at.jpg?linkonly |1948 pole with 7not 8, insulators}}+{{ ::x178_project_intro_easton_2023.pdf |2023April 14; "Confidential" Project information sent with the email above.}}
  
-{{ ::2015_load_has_not_required_upgrade_of_remaining_lines_x-178.png?linkonly |2015"load has not required upgrade of remaining [336,400 circular mils] lines"}}+{{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17; PAC submission, replace 56 structures out of 570 at $11.2 million, later cancelled}} 
 + 
 +{{ :x178:2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossing application, no mention of pole condition problems.}} 
 + 
 +{{ :x178:helicopters_x-178_crossbar_replacement.png?linkonly |circa 2017 crossbar and insulator replacement}} 
 + 
 +{{ ::x178_final_report.pdf |2016; X-178 dumped pole clean up by Eversource under pressure from Easton Conservation Commission. New line is proposed to be built in areas Eversource deemed too vulnerable for pole removal.}}
  
 {{ ::bog_pond_scenic_area.pdf |2016: Bog Pond Scenic Area proposal rejected by WMNF}} {{ ::bog_pond_scenic_area.pdf |2016: Bog Pond Scenic Area proposal rejected by WMNF}}
Line 39: Line 45:
 {{ ::bog_pond_scenic_area_procedural_history.pdf |2016: Bog Pond Scenic Area procedural history}} {{ ::bog_pond_scenic_area_procedural_history.pdf |2016: Bog Pond Scenic Area procedural history}}
  
-{{:x178:bog_pond_1.jpg?linkonly|Bog Pond area}}+{{ ::15-464_2015-10-19_eversource_ptestimony_r_andrew.pdf |2015, October 19; Testimony for Northern Pass; "load has not required upgrade of remaining [336] lines"}}
  
-{{ ::x178_final_report.pdf |X-178 dumped pole clean up by Eversource under pressure from Easton Conservation Commission. New line is proposed to be built in areas Eversource deemed too vulnerable for pole removal.}}+{{ :x178:eversource_transmission_line_valuation_easton_001.jpg?linkonly |2014: Eversource valuation of ROW and infrastructure in Easton}}
  
-{{ :x178:2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossing applicationno mention of pole condition problems.}}+{{ ::northern_pass_and_the_white_mountain_national_forest_5-22-2013.pdf |2013May 22;: Northern Pass and WMNF Special Use Permit requirements}}
  
-{{ :x178:helicopters_x-178_crossbar_replacement.png?linkonly |circa 2017 crossbar and insulator replacement}}+{{ :x178:wmnf_sup_exhibitsabcd.pdf |NP Special Use Permit info. for WMNF with map showing where Eversource has no ROW}}
  
-{{ :x178:a5_115kv_structure_replacement_and_asset_conditions_multiple_lines.pdf|October 2018 PAC meeting}}+{{ ::muntz_poem.pdf |2013; found poem; Muntz WMNF special use permit application}}
  
-{{ ::e_22018-9_115kv_pac_submissions.pdf |2018 PAC submission}}+{{ :x178:bog_pond_looking_toward_notch.jpg?linkonly |Bog Pond area looking toward Old Kinsman Notch}}
  
-{{ ::bog_pond_feis.pdf |FEIS}}+{{ :x178:bog_pond_with_dumped_poles.jpg?linkonly |Bog Pond area with poles dumped in 1986 "upgrade"}}
  
-{{ ::4-14-23_e_to_easton_.png?linkonly |4-14-23; E$ to Easton: "The only request at this point in time is keeping it to municipal staff only while we complete additional outreach to the towns along this line from Campton up to Whitefield.'}}+{{ :x178:bpg_pond_looking_toward_at.jpg?linkonly |1948 pole Bog Pond area}}
  
-{{ ::x178_project_intro_easton_2023.pdf |4-14-23: "Confidential" Project information sent with the email above.}}+{{:x178:bog_pond_1.jpg?linkonly|Bog Pond area}}
  
-{{ ::x178:x178_project-introduction-letter.pdf |4-22-2023"Dear Neighbor" letter}}+{{ ::e_22018-9_115kv_pac_submissions.pdf |2018 PAC presentationproposed replacement of 56 poles out of 570 at cost of $11. million, later withdrawn}}
  
-{{ :x178:x178_project-fact-sheet.pdf |Project Fact Sheet sent to landowners claiming reliability}}+{{ ::bog_pond_feis.pdf |FEIS}}
  
-{{ :x178:eversource_transmission_line_valuation_easton_001.jpg?linkonly |}} 
  
-{{ :x178:letter_to_iso_re_x-178_line_and_asset_condition_5-2023.pdf |May 2023 letter to ISO re X-178 and Asset Condition problem}}+{{ :x178:psnh_pesticides_on_row.pdf |Pesticides used on ROW until 1985}}
  
-{{ :x178:questions_for_eversource_re_proposed_x-178_upgrade_5_2023.pdf |May 2023 questions for Eversource}}+{{ ::psnh_upgrade_x-178.pdf |1986 'upgrade' paid for by Hydro-Quebec}}
  
-{{ :x178:questions_for_eversource_re_proposed_x-178_upgrade_6_2023.pdf |June 2023 questions for Eversource}}+{{ ::1970_fs_denies_psnh_sup_bog_pond.pdf |Forest Service denies PSNH special use permit 1970}}
  
-{{ :x178:response_to_eversource_x-178_5_24_2023.pdf |5-24-2-23 response to Eversource answers to questions}}+{{ ::1945_fs_suggests_bog_pond.pdf |1945: Forest Service suggests Bog Pond rather than Coppermine Trail}}
  
- +{{ :x178:bog_pond_from_south_kinsman_before_powerlines.jpg?linkonly |Bog Pond from South Kinsman before powerline}}
-{{ ::img_20230429_072844702.jpg?linkonly |photo of line May 2023}}+
x-178.1691832811.txt.gz · Last modified: 2023/08/12 10:33 by sigridundset