x-178 [2023/08/12 10:15] sigridundset |
x-178 [2023/08/22 10:08] (current) sigridundset |
||
---|---|---|---|
Line 1: | Line 1: | ||
- | X-178 115V Line, built in 1948 and one section " | + | X-178 115V Line, built in 1948-9 and one section " |
- | {{ :: | + | Listed as cancelled in June 2023 Asset Condition Project list. |
- | {{ ::x178-2-draft-map-set.pdf |North Woodstock | + | {{ ::x178-1-draft-map-set.pdf |2023, August 1; Campton, Thornton and Woodstock DRAFT proposed construction plans}} |
- | {{ ::x178-3-draft-map-set.pdf |Sugar Hill, Bethlehem, Dalton, Whitefield | + | {{ ::x178-2-draft-map-set.pdf |2023, August 1; North Woodstock to Sugar Hill DRAFT proposed construction plans}} |
- | {{ ::dji_0299.jpg? | + | {{ ::x178-3-draft-map-set.pdf |2023, August 1; Sugar Hill, Bethlehem, Dalton, Whitefield DRAFT proposed construction plans}} |
- | {{ ::dji_0313.jpg? | + | {{ ::tags_sh_1948_x-178.jpg? |
- | {{ ::2015_load_has_not_required_upgrade_of_remaining_lines_x-178.png?linkonly |2015: "load has not required upgrade of remaining [336,400 circular mils] lines"}} | + | {{ ::dji_0299.jpg?linkonly |2023, July 3; drone image X-178 }} |
- | {{ ::1945_fs_suggests_bog_pond.pdf |1945: Forest Service suggests Bog Pond rather than Coppermine Trail}} | + | {{ ::dji_0313.jpg? |
- | {{ ::1970_fs_denies_psnh_sup_bog_pond.pdf |Forest Service denies PSNH special use permit 1970}} | + | {{ :x178:letter_to_iso_re_x-178_line_and_asset_condition_5-2023.pdf |2023, May letter to ISO re X-178 and Asset Condition problem}} |
- | {{ :x178:psnh_pesticides_on_row.pdf |Pesticides used on ROW until 1985}} | + | {{ :x178:questions_for_eversource_re_proposed_x-178_upgrade_6_2023.pdf |2023, June; questions for Eversource}} |
- | {{ ::psnh_upgrade_x-178.pdf |1986 ' | + | {{ :x178:response_to_eversource_x-178_5_24_2023.pdf |2023, May 24; response to Eversource answers to questions}} |
- | {{ ::northern_pass_and_the_white_mountain_national_forest_5-22-2013.pdf |2013: Northern Pass and WMNF Special Use Permit requirements}} | + | {{ :x178:questions_for_eversource_re_proposed_x-178_upgrade_5_2023.pdf |2023, May; questions for Eversource}} |
- | {{ :x178:wmnf_sup_exhibitsabcd.pdf |NP Special Use Permit info. for WMNF with map showing where Eversource has no ROW}} | + | {{ ::img_20230429_072844702.jpg? |
- | {{ ::muntz_poem.pdf |found poem; Muntz WMNF special use permit application}} | + | {{ ::x178: |
+ | {{ : | ||
- | {{ ::bog_pond_scenic_area.pdf |2016: Bog Pond Scenic Area proposal rejected by WMNF}} | + | {{ ::4-14-23_e_to_easton_.png? |
- | {{ ::bog_pond_scenic_area_procedural_history.pdf |2016: Bog Pond Scenic Area procedural history}} | + | {{ ::x178_project_intro_easton_2023.pdf |2023, April 14; " |
- | {{:x178:bog_pond_1.jpg? | + | {{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17; PAC submission, replace 56 structures out of 570 at $11.2 million, later cancelled}} |
- | {{ :x178:bog_pond_from_south_kinsman_before_powerlines.jpg? | + | {{ :x178:2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossing application, |
- | {{ :x178:bog_pond_looking_toward_notch.jpg?linkonly |Bog Pond looking toward notch}} | + | {{ :x178:helicopters_x-178_crossbar_replacement.png?linkonly |circa 2017 crossbar and insulator replacement}} |
- | {{ :x178:bog_pond_with_dumped_poles.jpg? | + | {{ ::x178_final_report.pdf |2016; X-178 dumped |
- | {{ :x178:bpg_pond_looking_toward_at.jpg? | + | {{ ::bog_pond_scenic_area.pdf |2016: Bog Pond Scenic Area proposal rejected by WMNF}} |
- | {{ ::x178_final_report.pdf |X-178 dumped pole clean up by Eversource under pressure from Easton Conservation Commission. New line is proposed to be built in areas Eversource deemed too vulnerable for pole removal: "NOT REMOVED.buried and surrounded by bog, Mapped RTE habitat | + | {{ ::bog_pond_scenic_area_procedural_history.pdf |2016: Bog Pond Scenic Area procedural history}} |
- | 251 Lincoln 4 4 firm 4 poles 0 NOT REMOVED.buried and surrounded by bog, Mapped RTE habitat | + | |
- | 252 Lincoln 4 4 firm 4 poles 0 NOT REMOVED.buried and surrounded by bog, Mapped RTE habitat | + | |
- | 253 Lincoln 2 2 firm 2 poles 0 NOT REMOVED.buried and surrounded by bog, Mapped RTE habitat | + | |
- | 254 Lincoln 2 2 firm poles and 2 5' pieces 1 pole & 2 pieces@5 1 1 pole lying on top of another was removed. OTHER LEFT TO REDUCE IM | + | |
- | 255 Lincoln 2 2 2 full, in-between 2 poles 0 NOT REMOVED.buried and surrounded by bog, Mapped RTE habitat | + | |
- | 256 Lincoln 4 3 1 2 full, 1 30’, 2x10’, in-between, cross arm 4 equivalents 0 NOT REMOVED.buried and surrounded by bog, Mapped RTE habitat" | + | |
- | {{ :x178:2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossing application, no mention | + | {{ ::15-464_2015-10-19_eversource_ptestimony_r_andrew.pdf |2015, October 19; Testimony for Northern Pass; "load has not required upgrade |
- | {{ :x178:helicopters_x-178_crossbar_replacement.png?linkonly |circa 2017 crossbar | + | {{ :x178:eversource_transmission_line_valuation_easton_001.jpg?linkonly |2014: Eversource valuation of ROW and infrastructure in Easton}} |
- | {{ :x178:a5_115kv_structure_replacement_and_asset_conditions_multiple_lines.pdf|October 2018 PAC meeting}} | + | {{ ::northern_pass_and_the_white_mountain_national_forest_5-22-2013.pdf |2013, May 22;: Northern Pass and WMNF Special Use Permit requirements}} |
- | {{ ::e_22018-9_115kv_pac_submissions.pdf |2018 PAC submission}} | + | {{ :x178:wmnf_sup_exhibitsabcd.pdf |NP Special Use Permit info. for WMNF with map showing where Eversource has no ROW}} |
- | {{ ::bog_pond_feis.pdf |FEIS}} | + | {{ ::muntz_poem.pdf |2013; found poem; Muntz WMNF special use permit application}} |
- | {{ ::x178:x178_project-introduction-letter.pdf |2023: "Dear Neighbor" | + | {{ :x178:bog_pond_looking_toward_notch.jpg? |
- | {{ :x178:x178_project-fact-sheet.pdf |Project Fact Sheet sent to landowners claiming reliability}} | + | {{ :x178:bog_pond_with_dumped_poles.jpg? |
- | {{ :x178:eversource_transmission_line_valuation_easton_001.jpg? | + | {{ :x178:bpg_pond_looking_toward_at.jpg? |
- | {{ :x178:letter_to_iso_re_x-178_line_and_asset_condition_5-2023.pdf |May 2023 letter to ISO re X-178 and Asset Condition problem}} | + | {{:x178:bog_pond_1.jpg? |
- | {{ :x178:questions_for_eversource_re_proposed_x-178_upgrade_5_2023.pdf |May 2023 questions for Eversource}} | + | {{ ::e_22018-9_115kv_pac_submissions.pdf |2018 PAC presentation: |
- | {{ :x178:questions_for_eversource_re_proposed_x-178_upgrade_6_2023.pdf |June 2023 questions for Eversource}} | + | {{ ::bog_pond_feis.pdf |FEIS}} |
- | {{ : | ||
+ | {{ : | ||
- | {{ ::img_20230429_072844702.jpg? | + | {{ ::psnh_upgrade_x-178.pdf |1986 ' |
+ | |||
+ | {{ :: | ||
+ | |||
+ | {{ :: | ||
+ | |||
+ | {{ : |