-X-178 115V Line, built in 1948 and one section "upgraded" in 1986+X-178 115V Line, built in 1948-9 and one section "upgraded" in 1986
  
-{{ ::x178-1-draft-map-set.pdf |Campton, Thornton and Woodstock DRAFT proposed construction plans}}+Listed as cancelled in June 2023 Asset Condition Project list.
  
-{{ ::x178-2-draft-map-set.pdf |North Woodstock to Sugar Hill DRAFT proposed construction plans}}+{{ ::x178-1-draft-map-set.pdf |2023, August 1; Campton, Thornton and Woodstock DRAFT proposed construction plans}}
  
-{{ ::x178-3-draft-map-set.pdf |Sugar Hill to Whitefield DRAFT proposed construction plans}}+{{ ::x178-2-draft-map-set.pdf |2023, August 1; North Woodstock to Sugar Hill DRAFT proposed construction plans}}
  
-{{ ::dji_0299.jpg?linkonly |X-178 july 32023}}+{{ ::x178-3-draft-map-set.pdf |2023, August 1; Sugar Hill, Bethlehem, Dalton, Whitefield DRAFT proposed construction plans}}
  
-{{ ::dji_0313.jpg?linkonly |x-178 no road july 3, 2023}}+{{ ::tags_sh_1948_x-178.jpg?linkonly |2023, Inspection/Treatment tags on 1948 section of line}}
  
-{{ ::2015_load_has_not_required_upgrade_of_remaining_lines_x-178.png?linkonly |2015: "load has not required upgrade of remaining [336,400 circular mils] lines"}}+{{ ::dji_0299.jpg?linkonly |2023July 3; drone image X-178 }}
  
-{{ ::1945_fs_suggests_bog_pond.pdf |1945: Forest Service suggests Bog Pond rather than Coppermine Trail}}+{{ ::dji_0313.jpg?linkonly |2023, July 23; drone image x-178 no road }}
  
-{{ ::1970_fs_denies_psnh_sup_bog_pond.pdf |Forest Service denies PSNH special use permit 1970}}+{{ :x178:letter_to_iso_re_x-178_line_and_asset_condition_5-2023.pdf |2023, May letter to ISO re X-178 and Asset Condition problem}}
  
-{{ :x178:psnh_pesticides_on_row.pdf |Pesticides used on ROW until 1985}}+{{ :x178:questions_for_eversource_re_proposed_x-178_upgrade_6_2023.pdf |2023, June; questions for Eversource}}
  
-{{ ::psnh_upgrade_x-178.pdf |1986 'upgrade' paid for by Hydro-Quebec}}+{{ :x178:response_to_eversource_x-178_5_24_2023.pdf |2023, May 24;  response to Eversource answers to questions}}
  
-{{ ::northern_pass_and_the_white_mountain_national_forest_5-22-2013.pdf |2013: Northern Pass and WMNF Special Use Permit requirements}}+{{ :x178:questions_for_eversource_re_proposed_x-178_upgrade_5_2023.pdf |2023, May; questions for Eversource}}
  
-{{ :x178:wmnf_sup_exhibitsabcd.pdf |NP Special Use Permit info. for WMNF with map showing where Eversource has no ROW}}+{{ ::img_20230429_072844702.jpg?linkonly |2023, May; photo of line}}
  
-{{ ::muntz_poem.pdf |found poem; Muntz WMNF special use permit application}}+{{ ::x178:x178_project-introduction-letter.pdf |2023, April 22: "Dear Neighbor" letter}}
  
 +{{ :x178:x178_project-fact-sheet.pdf |2023, April; Project Fact Sheet sent to landowners claiming reliability}}
  
-{{ ::bog_pond_scenic_area.pdf |2016Bog Pond Scenic Area proposal rejected by WMNF}}+{{ ::4-14-23_e_to_easton_.png?linkonly |2023, April 14; E$ to Easton"The only request at this point in time is keeping it to municipal staff only while we complete additional outreach to the towns along this line from Campton up to Whitefield.'}}
  
-{{ ::bog_pond_scenic_area_procedural_history.pdf |2016: Bog Pond Scenic Area procedural history}}+{{ ::x178_project_intro_easton_2023.pdf |2023, April 14; "Confidential" Project information sent with the email above.}}
  
-{{:x178:bog_pond_1.jpg?linkonly|Bog Pond area}}+{{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17; PAC submission, replace 56 structures out of 570 at $11.2 million, later cancelled}}
  
-{{ :x178:bog_pond_from_south_kinsman_before_powerlines.jpg?linkonly |Bog Pond from South Kinsman before powerline}}+{{ :x178:2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossing application, no mention of pole condition problems.}}
  
-{{ :x178:bog_pond_looking_toward_notch.jpg?linkonly |Bog Pond looking toward notch}}+{{ :x178:helicopters_x-178_crossbar_replacement.png?linkonly |circa 2017 crossbar and insulator replacement}}
  
-{{ :x178:bog_pond_with_dumped_poles.jpg?linkonly |Bog Pond area with poles dumped in 1986 "upgrade"}}+{{ ::x178_final_report.pdf |2016; X-178 dumped pole clean up by Eversource under pressure from Easton Conservation Commission. New line is proposed to be built in areas Eversource deemed too vulnerable for pole removal.}}
  
-{{ :x178:bpg_pond_looking_toward_at.jpg?linkonly |1948 pole with 7, not 8, insulators}}+{{ ::bog_pond_scenic_area.pdf |2016: Bog Pond Scenic Area proposal rejected by WMNF}}
  
-{{ ::x178_final_report.pdf |X-178 dumped pole clean up by Eversource under pressure from Easton Conservation Commission. New line is proposed to be built in areas Eversource deemed too vulnerable for pole removal"NOT REMOVED.buried and surrounded by bog, Mapped RTE habitat +{{ ::bog_pond_scenic_area_procedural_history.pdf |2016Bog Pond Scenic Area procedural history}}
-251 Lincoln 4 4 firm 4 poles 0 NOT REMOVED.buried and surrounded by bog, Mapped RTE habitat +
-252 Lincoln 4 4 firm 4 poles 0 NOT REMOVED.buried and surrounded by bog, Mapped RTE habitat +
-253 Lincoln 2 2 firm 2 poles 0 NOT REMOVED.buried and surrounded by bog, Mapped RTE habitat +
-254 Lincoln 2 2 firm poles and 2 5' pieces 1 pole & 2 pieces@5 1 1 pole lying on top of another was removed. OTHER LEFT TO REDUCE IM +
-255 Lincoln 2 2 2 full, in-between 2 poles 0 NOT REMOVED.buried and surrounded by bog, Mapped RTE habitat +
-256 Lincoln 4 3 1 2 full, 1 30’, 2x10’, in-between, cross arm 4 equivalents 0 NOT REMOVED.buried and surrounded by bog, Mapped RTE habitat"}}+
  
-{{ :x178:2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossing applicationno mention of pole condition problems.}}+{{ ::15-464_2015-10-19_eversource_ptestimony_r_andrew.pdf |2015October 19; Testimony for Northern Pass; "load has not required upgrade of remaining [336] lines"}}
  
-{{ :x178:helicopters_x-178_crossbar_replacement.png?linkonly |circa 2017 crossbar and insulator replacement}}+{{ :x178:eversource_transmission_line_valuation_easton_001.jpg?linkonly |2014: Eversource valuation of ROW and infrastructure in Easton}}
  
-{{ :x178:a5_115kv_structure_replacement_and_asset_conditions_multiple_lines.pdf|October 2018 PAC meeting}}+{{ ::northern_pass_and_the_white_mountain_national_forest_5-22-2013.pdf |2013, May 22;: Northern Pass and WMNF Special Use Permit requirements}}
  
-{{ ::e_22018-9_115kv_pac_submissions.pdf |2018 PAC submission}}+{{ :x178:wmnf_sup_exhibitsabcd.pdf |NP Special Use Permit info. for WMNF with map showing where Eversource has no ROW}}
  
-{{ ::bog_pond_feis.pdf |FEIS}}+{{ ::muntz_poem.pdf |2013; found poem; Muntz WMNF special use permit application}}
  
-{{ ::x178:x178_project-introduction-letter.pdf |2023: "Dear Neighbor" letter}}+{{ :x178:bog_pond_looking_toward_notch.jpg?linkonly |Bog Pond area looking toward Old Kinsman Notch}}
  
-{{ :x178:x178_project-fact-sheet.pdf |Project Fact Sheet sent to landowners claiming reliability}}+{{ :x178:bog_pond_with_dumped_poles.jpg?linkonly |Bog Pond area with poles dumped in 1986 "upgrade"}}
  
-{{ :x178:eversource_transmission_line_valuation_easton_001.jpg?linkonly |}}+{{ :x178:bpg_pond_looking_toward_at.jpg?linkonly |1948 pole Bog Pond area}}
  
-{{ :x178:letter_to_iso_re_x-178_line_and_asset_condition_5-2023.pdf |May 2023 letter to ISO re X-178 and Asset Condition problem}}+{{:x178:bog_pond_1.jpg?linkonly|Bog Pond area}}
  
-{{ :x178:questions_for_eversource_re_proposed_x-178_upgrade_5_2023.pdf |May 2023 questions for Eversource}}+{{ ::e_22018-9_115kv_pac_submissions.pdf |2018 PAC presentation: proposed replacement of 56 poles out of 570 at cost of $11. million, later withdrawn}}
  
-{{ :x178:questions_for_eversource_re_proposed_x-178_upgrade_6_2023.pdf |June 2023 questions for Eversource}}+{{ ::bog_pond_feis.pdf |FEIS}}
  
-{{ :x178:response_to_eversource_x-178_5_24_2023.pdf |5-24-2-23 response to Eversource answers to questions}} 
  
 +{{ :x178:psnh_pesticides_on_row.pdf |Pesticides used on ROW until 1985}}
  
-{{ ::img_20230429_072844702.jpg?linkonly |photo of line May 2023}}+{{ ::psnh_upgrade_x-178.pdf |1986 'upgrade' paid for by Hydro-Quebec}} 
 + 
 +{{ ::1970_fs_denies_psnh_sup_bog_pond.pdf |Forest Service denies PSNH special use permit 1970}} 
 + 
 +{{ ::1945_fs_suggests_bog_pond.pdf |1945: Forest Service suggests Bog Pond rather than Coppermine Trail}} 
 + 
 +{{ :x178:bog_pond_from_south_kinsman_before_powerlines.jpg?linkonly |Bog Pond from South Kinsman before powerline}}