User Tools

Site Tools


u-199

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
u-199 [2023/08/15 16:02]
sigridundset
u-199 [2023/08/15 16:03] (current)
sigridundset
Line 3: Line 3:
 {{ ::2023_05_18_meeting_minutes_final.pdf |2023 May 18 PAC minutes, Replace 104 wood and 1 steel structures with new steel structures, Re-conductor 9.75 miles of 795ACSR with 1272 ACSS, Install 19.5 miles of OPGW (2 x 9.75 mi), Estimated PTF Cost: $51.18M (-25% / +50%), Projected In-service Date: Q2, 2026}} {{ ::2023_05_18_meeting_minutes_final.pdf |2023 May 18 PAC minutes, Replace 104 wood and 1 steel structures with new steel structures, Re-conductor 9.75 miles of 795ACSR with 1272 ACSS, Install 19.5 miles of OPGW (2 x 9.75 mi), Estimated PTF Cost: $51.18M (-25% / +50%), Projected In-service Date: Q2, 2026}}
  
-{{ ::b112-u199-q195_rebuild_presentation.pdf |Line rebuild presentation}}+{{ ::b112-u199-q195_rebuild_presentation.pdf |2023, May 18, presentation to PAC}}
  
  
u-199.1692111722.txt.gz ยท Last modified: 2023/08/15 16:02 by sigridundset