User Tools

Site Tools


r-187

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
r-187 [2023/08/26 08:08]
sigridundset
r-187 [2023/08/26 11:23] (current)
sigridundset
Line 1: Line 1:
 R-187 115kV line R-187 115kV line
- 
  
  
Line 13: Line 12:
 {{ ::crossing_petition_r-187.pdf |2021, May petition exhibits}} {{ ::crossing_petition_r-187.pdf |2021, May petition exhibits}}
  
-{{ ::r187:r-187.jpg?linkonly |pole}}+{{ ::r187:r-187.jpg?linkonly |pole in good condition being cut down}} 
 + 
 +{{ :r187:r-187_pole_stub.jpg?linkonly |pole stub after felling}}
  
-{{ :r187:r-187_2.jpg?linkonly |}pole}}+{{ :r187:r-187_2.jpg?linkonly |pole in good condition laying on altered terrain. "Recent structure replacements have revealed additional concerns about the integrity of laminated wood structures installed between 2000 and 2014"}}
  
-{{ :r187:r-187_felled_4.jpg?linkonly |felled pole}}+{{ :r187:r-187_felled_4.jpg?linkonly |good condition labeled felled pole}}
  
 {{ :r187:r-187_inspection_or_treatment_2001.jpg?linkonly |inspection or treatment tag}} {{ :r187:r-187_inspection_or_treatment_2001.jpg?linkonly |inspection or treatment tag}}
  
-{{ :r187:r-187_long.jpg?linkonly |asset condition A}}+{{ :r187:r-187_long.jpg?linkonly |very long good condition pole on trucked in gravel pad}}
  
-{{ :r187:r-187_nice_looking.jpg?linkonly |asset condition A}}+{{ :r187:r-187_pile.jpg?linkonly |pole pile on trucked in gravel pad}}
  
-{{ :r187:r-187_pile.jpg?linkonly |pole pile}}+{{ :r187:r-187_pile_2.jpg?linkonly |same pole pile showing extensive cleared and graveled land}}
  
-{{ :r187:r-187_pile_2.jpg?linkonly |pole pile}}+{{ :r187:r-187_psnh.jpg?linkonly PSNH tag|Pole with tag and number}}
  
-{{ :r187:r-187_psnh.jpg?linkonly PSNH tag|}} 
  
-{{ :r187:r-187_pole_stub.jpg?linkonly |pole stub}} 
  
  
  
  
r-187.1693033687.txt.gz · Last modified: 2023/08/26 08:08 by sigridundset