lines [2023/08/18 13:49] sigridundset |
lines [2023/08/26 11:33] (current) sigridundset |
||
|---|---|---|---|
| Line 25: | Line 25: | ||
| [[391|391 $17.8 m. and $9 m.]] | [[391|391 $17.8 m. and $9 m.]] | ||
| + | |||
| + | [[1132|1132]] | ||
| + | |||
| + | [[1505|1505]] | ||
| + | |||
| + | [[3403|3403 $8.4 m.(Phase 2)]] | ||
| ===== 115kV Lines ===== | ===== 115kV Lines ===== | ||
| Line 32: | Line 38: | ||
| [[A-126|A-126 $8.4 m.]] | [[A-126|A-126 $8.4 m.]] | ||
| - | [[A-152|A-152 $6.9 m.]] | + | [[A-152|A-152 $6.9 m.(Phase 2)]] |
| [[B-112 |B-112 $105 m.]] | [[B-112 |B-112 $105 m.]] | ||
| Line 86: | Line 92: | ||
| [[M-127|M-127 $29.7 m.]] | [[M-127|M-127 $29.7 m.]] | ||
| - | [[M-164|M-164 $6 m. ]] | + | [[M-164|M-164 $6 m. (Phase 2)]] |
| [[M-183|M-183 $6 m.]] | [[M-183|M-183 $6 m.]] | ||
| Line 102: | Line 108: | ||
| [[R-169|R-169 $8.4 (phase 3)]] | [[R-169|R-169 $8.4 (phase 3)]] | ||
| - | [[R-187|R-187 $7.5 m.]] | + | [[R-187|R-187 $7.5 m. (phase 2)]] |
| [[R-193|R-193 $7.7 m.]] | [[R-193|R-193 $7.7 m.]] | ||
| Line 110: | Line 116: | ||
| [[S-153|S-153 $5 m.]] | [[S-153|S-153 $5 m.]] | ||
| - | [[S-188|S-188 $7.3 m.]] | + | [[S-188|S-188 $7.3 m. (phase 2)]] |
| [[T-198|T-198 $19 m.]] | [[T-198|T-198 $19 m.]] | ||
| Line 118: | Line 124: | ||
| [[U-199|U-199 $51 m.]] | [[U-199|U-199 $51 m.]] | ||
| - | [[V-182|V-182 $33. m (phase 3]] | + | [[V-191|V-191 $10 m.]] |
| - | + | ||
| - | [[V-191|V-191 $10 m. )]] | + | |
| [[W-171|W-179]] | [[W-171|W-179]] | ||