User Tools

Site Tools


lines

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
lines [2023/08/18 10:21]
sigridundset
lines [2023/08/26 12:33] (current)
sigridundset
Line 12: Line 12:
 [[307|307 $9.4 m.]] [[307|307 $9.4 m.]]
  
-[[326|326]]+[[326|326 $6 m.]]
  
-[[367|367]]+[[367|367 $15.2 m.]]
  
 [[373|373 $10 m.]] [[373|373 $10 m.]]
Line 24: Line 24:
 [[385|385 45 m.]] [[385|385 45 m.]]
  
-[[391|391 $12 m. and $9 m.]]+[[391|391 $17.8 m. and $9 m.]] 
 + 
 +[[1132|1132]] 
 + 
 +[[1505|1505]] 
 + 
 +[[3403|3403 $8.4 m.(Phase 2)]]
  
 ===== 115kV Lines ===== ===== 115kV Lines =====
  
-[[A-111|A-111 $31 m.]]+[[A-111|A-111 $53 m.]]
  
 [[A-126|A-126 $8.4 m.]] [[A-126|A-126 $8.4 m.]]
  
-[[A-152|A-152 $6.9 m.]]+[[A-152|A-152 $6.9 m.(Phase 2)]]
  
 [[B-112 |B-112 $105 m.]] [[B-112 |B-112 $105 m.]]
Line 38: Line 44:
 [[B-143|B-143 $17.3 ]] [[B-143|B-143 $17.3 ]]
  
-[[C-129|C-129]]+[[C-129|C-129 $12 m.]]
  
-[[C-189|C-189]]+[[C-189|C-189 $12.8 (phase 3)]]
  
-[[C-196|C-196 $6.2 m.& $11.7 m.]]+[[C-196|C-196 $6.2 m.& $11.7 m. & 14.8 m.]]
  
-[[D-108|D-108]]+[[D-108|D-108 $6.7 m.]]
  
-[[D-121|D-121 %5 m.]]+[[D-121|D-121 $5 m.]]
  
-[[D-142|D-142]]+[[D-142|D-142 $59 m.]]
  
-[[E-115|E-115- $54 m.]]+[[E-115|E-115- $64 m.]]
  
 [[E-194|E-194 $8.7 m.]] [[E-194|E-194 $8.7 m.]]
Line 56: Line 62:
 [[F-139|F-139 $58 m.]] [[F-139|F-139 $58 m.]]
  
-[[G-128|G-128]]+[[G-128|G-128 Phase 1: 47 m.]]
  
-[[G-146|G-146]]+[[G-146|G-146 $58 m. (phase 3)]]
  
 [[G-192|G-192]] [[G-192|G-192]]
Line 64: Line 70:
 [[H-123|H-123 $5.8 m.]] [[H-123|H-123 $5.8 m.]]
  
-[[H-137|H-137]]+[[H-137|H-137 $7.8 m. (phase 3)]]
  
-[[H-141|H-141]]+[[H-141|H-141 $9.4 m. $19 m. (phase 3)]]
  
-[[I-158|I-158]]+[[I-158|I-158 $28.6 m. (phase 3)]]
  
 [[J-114|J-114 $9.7 m.]] [[J-114|J-114 $9.7 m.]]
  
-[[K-105|K-105]]+[[K-105|K-105 phase 1: $4.1 m.]]
  
 [[K-165|K-165]] [[K-165|K-165]]
  
-[[K-174|K-174]]+[[K-174|K-174 $16.2 m.]]
  
-[[L-163|L-163]]+[[L-163|L-163 $17 m.]]
  
-[[L-175|L-175 $3.8 m.]]+[[L-175|L-175 phase 1: $3.8 m.]]
  
-[[M-108|M-108/V-182]]+[[M-108|M-108/V-182 $13.4 m. (phase 3)]]
  
-[[M-127|M-127]]+[[M-127|M-127 $29.7 m.]]
  
-[[M-164|M-164]]+[[M-164|M-164 $6 m. (Phase 2)]]
  
 [[M-183|M-183 $6 m.]] [[M-183|M-183 $6 m.]]
  
-[[O-154|O-154]]+[[O-154|O-154 $51 m.]]
  
 [[P-106|P-106 $5.6 m.]] [[P-106|P-106 $5.6 m.]]
  
-[[P-145|P-145]]+[[P-145|P-145 $52 m.]]
  
 [[Q-171|Q-171 $15 m.]] [[Q-171|Q-171 $15 m.]]
Line 100: Line 106:
 [[Q-195|Q-195 $100 m.]] [[Q-195|Q-195 $100 m.]]
  
-[[R-169|R-169]]+[[R-169|R-169 $8.4 (phase 3)]]
  
-[[R-187|R-187]]+[[R-187|R-187 $7.5 m. (phase 2)]]
  
 [[R-193|R-193 $7.7 m.]] [[R-193|R-193 $7.7 m.]]
  
-[[S-136|S-136]]+[[S-136|S-136 $6.2 m.]]
  
 [[S-153|S-153 $5 m.]] [[S-153|S-153 $5 m.]]
  
-[[S-188|S-188]]+[[S-188|S-188 $7.3 m. (phase 2)]]
  
-[[T-198|T-198]]+[[T-198|T-198 $19 m.]]
  
 [[U-181|U-181 $8.5 m.]] [[U-181|U-181 $8.5 m.]]
Line 118: Line 124:
 [[U-199|U-199 $51 m.]] [[U-199|U-199 $51 m.]]
  
-[[V-182|V-182]] +[[V-191|V-191 $10 m.]]
- +
-[[V-191|V-191]]+
  
 [[W-171|W-179]] [[W-171|W-179]]
  
-[[X-104|X-104]]+[[X-104|X-104 $7 m.]]
  
-[[X-116|X-116]]+[[X-116|X-116 $24.6]]
  
-[[X-178|X-178]]+[[X-178|X-178 $11 m. project dropped and replaced with $50 m.project]]
  
-[[Y-138|Y-138]]+[[Y-138|Y-138 $8.5 m.]]
  
-[[Z-119|Z-119]]+[[Z-119|Z-119 $23.4 m. phase 1]]
  
 [[Z-180|Z-180 $14.5 m.]] [[Z-180|Z-180 $14.5 m.]]
lines.1692350479.txt.gz · Last modified: 2023/08/18 10:21 by sigridundset