User Tools

Site Tools


j-114

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Next revision
Previous revision
j-114 [2023/08/15 15:30]
sigridundset created
j-114 [2023/08/27 10:57] (current)
sigridundset
Line 1: Line 1:
 J-114 J-114
  
-{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, reconductor with Optical Ground Wire (OPGW); $9.7 million}}+{{ ::j114:aot2407_rm.pdf |DES permits Alteration of Terrain with waivers}} 
 + 
 +{{ :j114:aot-2407_plans.pdf |Alteration of Terrain Plans}} 
 + 
 +{{ :j114:aot-2407_plans_approved_stamp.pdf |Alteration of Terrain stamped first page}} 
 + 
 +{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}} 
 + 
 +{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 32 out of 49 structures and reconductor with Optical Ground Wire (OPGW); $9.7 million}} 
 + 
 +{{ :j114:prlac_5_16_23_minutes_june_agenda-1.pdf |2023, May 16th, PRLAC June Agenda}}
j-114.1692109859.txt.gz · Last modified: 2023/08/15 15:30 by sigridundset