Both sides previous revision
Previous revision
Next revision
|
Previous revision
|
h-141 [2023/06/14 12:03] sigridundset |
h-141 [2023/08/26 08:59] (current) sigridundset |
H-141 115kV line | H-141 115kV line |
| |
| {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} |
{{ ::e_22018-9_115kv_pac_submissions.pdf |2018 PAC submission}} | |
| |
{{ ::petition_h-141.pdf |petition}} | {{ ::petition_h-141.pdf |petition}} |
| |
{{ ::6-cre-2023-008-revised-license.pdf |2023 revised license}} | {{ ::6-cre-2023-008-revised-license.pdf |2023 revised license}} |
| |
| {{ :a126:aot-2412_permit_rm.pdf |2023, June 27: Alteration of Terrain permit with waivers}} |
| |
| {{ :a126:aot-2412_plans.pdf |2023, June 16: Alteration of Terrain plans}} |
| |
| {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 35 out of 182 structures; $8.4 million}} |
| |
| {{ ::2023_05_18_meeting_minutes_final.pdf |2023 may 18 PAC minutes}} |
| |
| {{ ::a126:aot-2412_miscellaneous_r.pdf |2023, May 5: cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."}} |
| |
| {{ ::oct_17_2018_seven_115kv_asset_conditions_lines_partial.pdf |2018, October 17, presentation to PAC, replace 49 structures, $8.3 million}} |
| |
{{ ::7192018_notice_of_decision-eversource.pdf |notice of decision ES}} | {{ ::7192018_notice_of_decision-eversource.pdf |notice of decision ES}} |
| |
{{ ::h141_conductor_not_changed.pdf |September 2021, intra-department communication}} | {{ ::h141_conductor_not_changed.pdf |September 2021, intra-department communication}} |
| |
{{ ::h-141_2023.pdf |}} | |
| |
{{ :a5_115kv_structure_replacement_and_asset_conditions_multiple_lines.pdf |October 2018 PAC presentation}} | {{ :a5_115kv_structure_replacement_and_asset_conditions_multiple_lines.pdf |October 2018 PAC presentation}} |
| |
{{ ::h-141_2023.pdf |2023}} | {{ ::h-141_2023.pdf |2023 Danville Planning Board: "The structure replacements were selected based on site visit evaluations conducted by Eversource and must be replaced for the transmission line to continue |
| to function safely and reliably."}} |
| |
{{ ::may_meeting_packet.pdf |May 2019 Exeter Conservation Commission meeting packet}} | {{ ::may_meeting_packet.pdf |May 2019 Exeter Conservation Commission meeting packet}} |
| |
{{ ::recommendation.pdf |recommendation}} | {{ ::recommendation.pdf |recommendation}} |
| |
| {{ ::e_22018-9_115kv_pac_submissions.pdf |2018, October 17; PAC submission, replace 44 structures at $7.7 million}} |