G-146 $58 m. | G-146 $58 m. Not on June 2023 Asset Condition Project list |
| |
| {{ ::v-182_and_g-146_2015.png?linkonly |2015 Testimony Northern Pass}} |
| |
| {{ ::g-146_and_m-108.pdf |2023, February 13: Pembroke CC minutes: "replacement of 65 existing wooden pole structures with significantly larger weathered-steel structures...Roads through these easements will require significant improvement, including the permanent placement of gravel along the roadbed...Additionally, 100’x100’ gravel work pads will be constructed at each pole location. After completion of the project 60’x30’ pads will be left at each of these sites."}} |
| |
{{ :a05_2023_06_15_pac_laminated_wood_structure_replacements_phase_3.pdf |June 2023 PAC presentation}} | {{ :a05_2023_06_15_pac_laminated_wood_structure_replacements_phase_3.pdf |June 2023 PAC presentation}} |
| |
{{ ::g-146.pdf |G-146}} | {{ ::g-146.pdf |G-146}} |
| |
| {{ ::c-189_g146_h137_m108_maps.pdf |August 2, 2023 project maps}} |
| |
| |