User Tools

Site Tools


e-115

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
e-115 [2023/08/21 09:10]
sigridundset
e-115 [2023/08/21 09:17] (current)
sigridundset
Line 19: Line 19:
  
 {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March; request to NEPOOL for TCA}} {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March; request to NEPOOL for TCA}}
 +
 +{{ ::attachment_rr-dpu-es-3.pdf |2022, October 19; PAC presentation }}
 +
 +{{ ::a05_1_es-22-tca-20_final.pdf |2022, June 27: Final TCA E-115}}
 +
 +{{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor}}
  
 {{ ::e115-start-of-construction-letter.pdf |2022, June 23; start of construction letter}} {{ ::e115-start-of-construction-letter.pdf |2022, June 23; start of construction letter}}
Line 25: Line 31:
  
 {{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}} {{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}}
- 
-{{ ::a05_1_es-22-tca-20_final.pdf |2022: Final TCA E-115}} 
- 
-{{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor}} 
  
 {{ ::license-granted.pdf |January 2022, license granted}} {{ ::license-granted.pdf |January 2022, license granted}}
Line 36: Line 38:
 {{ :a05_1_es-22-tca-20_final.pdf |2022: Eversource Transmission Cost Allocation application}} {{ :a05_1_es-22-tca-20_final.pdf |2022: Eversource Transmission Cost Allocation application}}
  
-{{ ::attachment_rr-dpu-es-3.pdf |October 2022 PAC presentation, local system plan}} 
  
-{{ ::cr-2021-025-order-of-notice.pdf |2021:order of notice}}+{{ ::cr-2021-025-order-of-notice.pdf |2021: order of notice}}
  
 {{ ::petition-attachments.pdf |December 2021, petition attachment, 12/2016 original date, pole heights 52'-106'}} {{ ::petition-attachments.pdf |December 2021, petition attachment, 12/2016 original date, pole heights 52'-106'}}
e-115.1692605402.txt.gz ยท Last modified: 2023/08/21 09:10 by sigridundset