Both sides previous revision
Previous revision
Next revision
|
Previous revision
|
e-115 [2023/08/21 09:10] sigridundset |
e-115 [2023/08/21 09:17] (current) sigridundset |
| |
{{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March; request to NEPOOL for TCA}} | {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March; request to NEPOOL for TCA}} |
| |
| {{ ::attachment_rr-dpu-es-3.pdf |2022, October 19; PAC presentation }} |
| |
| {{ ::a05_1_es-22-tca-20_final.pdf |2022, June 27: Final TCA E-115}} |
| |
| {{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor}} |
| |
{{ ::e115-start-of-construction-letter.pdf |2022, June 23; start of construction letter}} | {{ ::e115-start-of-construction-letter.pdf |2022, June 23; start of construction letter}} |
| |
{{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}} | {{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}} |
| |
{{ ::a05_1_es-22-tca-20_final.pdf |2022: Final TCA E-115}} | |
| |
{{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor}} | |
| |
{{ ::license-granted.pdf |January 2022, license granted}} | {{ ::license-granted.pdf |January 2022, license granted}} |
{{ :a05_1_es-22-tca-20_final.pdf |2022: Eversource Transmission Cost Allocation application}} | {{ :a05_1_es-22-tca-20_final.pdf |2022: Eversource Transmission Cost Allocation application}} |
| |
{{ ::attachment_rr-dpu-es-3.pdf |October 2022 PAC presentation, local system plan}} | |
| |
{{ ::cr-2021-025-order-of-notice.pdf |2021:order of notice}} | {{ ::cr-2021-025-order-of-notice.pdf |2021: order of notice}} |
| |
{{ ::petition-attachments.pdf |December 2021, petition attachment, 12/2016 original date, pole heights 52'-106'}} | {{ ::petition-attachments.pdf |December 2021, petition attachment, 12/2016 original date, pole heights 52'-106'}} |