Line 17: Line 17:
  
 {{ ::a-111_bulldozer.jpeg?linkonly |Excavator, gravel truck and other heavy machinery on ROW}} {{ ::a-111_bulldozer.jpeg?linkonly |Excavator, gravel truck and other heavy machinery on ROW}}
- 
-{{ ::e115-start-of-construction-letter.pdf |start of construction letter}} 
- 
-{{ ::e115-project-maps.pdf |project maps}} 
  
 {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March; request to NEPOOL for TCA}} {{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March; request to NEPOOL for TCA}}
  
-{{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}}+{{ ::attachment_rr-dpu-es-3.pdf |2022, October 19PAC presentation }}
  
-{{ ::a05_1_es-22-tca-20_final.pdf |2022: Final TCA E-115}}+{{ ::a05_1_es-22-tca-20_final.pdf |2022, June 27: Final TCA E-115}}
  
 {{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor}} {{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor}}
 +
 +{{ ::e115-start-of-construction-letter.pdf |2022, June 23; start of construction letter}}
 +
 +{{ ::e115-project-maps.pdf |2022, May 12; project maps}}
 +
 +{{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}}
  
 {{ ::license-granted.pdf |January 2022, license granted}} {{ ::license-granted.pdf |January 2022, license granted}}
Line 36: Line 38:
 {{ :a05_1_es-22-tca-20_final.pdf |2022: Eversource Transmission Cost Allocation application}} {{ :a05_1_es-22-tca-20_final.pdf |2022: Eversource Transmission Cost Allocation application}}
  
-{{ ::attachment_rr-dpu-es-3.pdf |October 2022 PAC presentation, local system plan}} 
  
-{{ ::cr-2021-025-order-of-notice.pdf |2021:order of notice}}+{{ ::cr-2021-025-order-of-notice.pdf |2021: order of notice}}
  
 {{ ::petition-attachments.pdf |December 2021, petition attachment, 12/2016 original date, pole heights 52'-106'}} {{ ::petition-attachments.pdf |December 2021, petition attachment, 12/2016 original date, pole heights 52'-106'}}