User Tools

Site Tools


e-115

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
e-115 [2023/08/21 09:03]
sigridundset
e-115 [2023/08/21 09:17] (current)
sigridundset
Line 18: Line 18:
 {{ ::a-111_bulldozer.jpeg?linkonly |Excavator, gravel truck and other heavy machinery on ROW}} {{ ::a-111_bulldozer.jpeg?linkonly |Excavator, gravel truck and other heavy machinery on ROW}}
  
-{{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}}+{{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March; request to NEPOOL for TCA}}
  
-{{ ::a05_1_es-22-tca-20_final.pdf |2022: Final TCA E-115}}+{{ ::attachment_rr-dpu-es-3.pdf |2022, October 19; PAC presentation }}
  
-{{ ::e-115_z-1180_and_a-111_2023.pdf |2023March; request to NEPOOL for TCA}}+{{ ::a05_1_es-22-tca-20_final.pdf |2022June 27: Final TCA E-115}}
  
 {{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor}} {{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor}}
 +
 +{{ ::e115-start-of-construction-letter.pdf |2022, June 23; start of construction letter}}
 +
 +{{ ::e115-project-maps.pdf |2022, May 12; project maps}}
 +
 +{{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}}
  
 {{ ::license-granted.pdf |January 2022, license granted}} {{ ::license-granted.pdf |January 2022, license granted}}
Line 32: Line 38:
 {{ :a05_1_es-22-tca-20_final.pdf |2022: Eversource Transmission Cost Allocation application}} {{ :a05_1_es-22-tca-20_final.pdf |2022: Eversource Transmission Cost Allocation application}}
  
-{{ ::attachment_rr-dpu-es-3.pdf |October 2022 PAC presentation, local system plan}} 
  
-{{ ::cr-2021-025-order-of-notice.pdf |2021:order of notice}}+{{ ::cr-2021-025-order-of-notice.pdf |2021: order of notice}}
  
 {{ ::petition-attachments.pdf |December 2021, petition attachment, 12/2016 original date, pole heights 52'-106'}} {{ ::petition-attachments.pdf |December 2021, petition attachment, 12/2016 original date, pole heights 52'-106'}}
Line 46: Line 51:
 {{ ::e1115crossing.pdf |crossing}} {{ ::e1115crossing.pdf |crossing}}
  
-{{ ::e115-start-of-construction-letter.pdf |start of construction letter}} 
  
-{{ ::e115-project-maps.pdf |project maps}} 
  
 {{ :a5_webster_beebe_river_115kv_corridor_asset-conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |asset condition projects}} {{ :a5_webster_beebe_river_115kv_corridor_asset-conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |asset condition projects}}
  
-{{ :e_22018-9_115kv_pac_submissions.pdf |PAC submission}}+
  
  
  
  
e-115.1692605028.txt.gz ยท Last modified: 2023/08/21 09:03 by sigridundset