 E-115 115kV Line $64 million E-115 115kV Line $64 million
  
-{{ ::a05_1_es-22-tca-20_final.pdf |2022: Final TCA E-115}}+{{ :a-111_long_road.png?linkonly |Long road}}
  
-{{ ::e-115_z-1180_and_a-111_2023.pdf |March 2023 request to NEPOOL for TCA}}+{{ ::a-111_wetland_matting.jpeg?linkonly |Wetland matting}} 
 + 
 +{{ ::a-111_sign.jpeg?linkonly |Stay away sign}} 
 + 
 +{{ ::a-111_road_road.jpeg?linkonly |Road and wetlands matting on ROW and new structures, conductor and OPGW}} 
 + 
 +{{ ::a-111_pole_and_water.jpeg?linkonly |New pole in water}} 
 + 
 +{{ ::a-111_new_hampton.jpeg?linkonly |Large truck hauling flatbed on wetland matting and road in ROW.}} 
 + 
 +{{ ::a-111_embedded_pole.jpeg?linkonly |Two new poles in water}} 
 + 
 +{{ ::a-111_bulldozer.jpeg?linkonly |Excavator, gravel truck and other heavy machinery on ROW}} 
 + 
 +{{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March; request to NEPOOL for TCA}} 
 + 
 +{{ ::attachment_rr-dpu-es-3.pdf |2022, October 19; PAC presentation }} 
 + 
 +{{ ::a05_1_es-22-tca-20_final.pdf |2022, June 27: Final TCA E-115}}
  
 {{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor}} {{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor}}
 +
 +{{ ::e115-start-of-construction-letter.pdf |2022, June 23; start of construction letter}}
 +
 +{{ ::e115-project-maps.pdf |2022, May 12; project maps}}
 +
 +{{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}}
  
 {{ ::license-granted.pdf |January 2022, license granted}} {{ ::license-granted.pdf |January 2022, license granted}}
Line 14: Line 38:
 {{ :a05_1_es-22-tca-20_final.pdf |2022: Eversource Transmission Cost Allocation application}} {{ :a05_1_es-22-tca-20_final.pdf |2022: Eversource Transmission Cost Allocation application}}
  
-{{ ::attachment_rr-dpu-es-3.pdf |October 2022 PAC presentation, local system plan}} 
  
-{{ ::cr-2021-025-order-of-notice.pdf |2021:order of notice}}+{{ ::cr-2021-025-order-of-notice.pdf |2021: order of notice}}
  
 {{ ::petition-attachments.pdf |December 2021, petition attachment, 12/2016 original date, pole heights 52'-106'}} {{ ::petition-attachments.pdf |December 2021, petition attachment, 12/2016 original date, pole heights 52'-106'}}
Line 28: Line 51:
 {{ ::e1115crossing.pdf |crossing}} {{ ::e1115crossing.pdf |crossing}}
  
-{{ ::e115-start-of-construction-letter.pdf |start of construction letter}} 
  
-{{ ::e115-project-maps.pdf |project maps}} 
  
 {{ :a5_webster_beebe_river_115kv_corridor_asset-conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |asset condition projects}} {{ :a5_webster_beebe_river_115kv_corridor_asset-conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |asset condition projects}}
  
-{{ :e_22018-9_115kv_pac_submissions.pdf |PAC submission}}+
  
  
  
  