Line 1: Line 1:
  
-E-115 115kV Line+E-115 115kV Line $64 million
  
-{{ :a05_1_es-22-tca-20_final.pdf |}}+{{ :a-111_long_road.png?linkonly |Long road}}
  
-{{ ::2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossings, no mention of pole degradation}}+{{ ::a-111_wetland_matting.jpeg?linkonly |Wetland matting}}
  
-{{ ::petition-attachments.pdf |December 2021, petition attachment, 12/2016 original date, pole heights 52'-106'}}+{{ ::a-111_sign.jpeg?linkonly |Stay away sign}}
  
-{{ ::a05_1_es-22-tca-20_final.pdf |Final TCA E-115}}+{{ ::a-111_road_road.jpeg?linkonly |Road and wetlands matting on ROW and new structures, conductor and OPGW}}
  
-{{ ::attachment_rr-dpu-es-3.pdf |October 2022 PAC presentation, local system plan}}+{{ ::a-111_pole_and_water.jpeg?linkonly |New pole in water}}
  
-{{ ::cr-2021-025-order-of-notice.pdf |order of notice}}+{{ ::a-111_new_hampton.jpeg?linkonly |Large truck hauling flatbed on wetland matting and road in ROW.}}
  
-{{ ::license-granted.pdf |January 2022, license granted}}+{{ ::a-111_embedded_pole.jpeg?linkonly |Two new poles in water}}
  
-{{ ::e-115_z-1180_and_a-111_2023.pdf |March 2023 request to NEPOOL for TCA}}+{{ ::a-111_bulldozer.jpeg?linkonly |Excavator, gravel truck and other heavy machinery on ROW}} 
 + 
 +{{ ::e-115_z-1180_and_a-111_2023.pdf |2023, March; request to NEPOOL for TCA}} 
 + 
 +{{ ::attachment_rr-dpu-es-3.pdf |2022, October 19; PAC presentation }} 
 + 
 +{{ ::a05_1_es-22-tca-20_final.pdf |2022, June 27: Final TCA E-115}} 
 + 
 +{{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115 before replacement with new larger line with taller and wider steel towers and larger conductor}} 
 + 
 +{{ ::e115-start-of-construction-letter.pdf |2022, June 23; start of construction letter}} 
 + 
 +{{ ::e115-project-maps.pdf |2022, May 12; project maps}} 
 + 
 +{{ ::03-29-22_mtg_minutes_prlac.pdf |2022, March 23; PRLAC (Pemigewasset River Local Advisory Committee) Minutes. Eversource later said no permits were required.}} 
 + 
 +{{ ::license-granted.pdf |January 2022, license granted}}
  
 {{ ::staff-recommendation.pdf |january 2022, staff recommendation}} {{ ::staff-recommendation.pdf |january 2022, staff recommendation}}
  
-{{ ::road_construction_on_the_e-115_line.pdf |road construction on the E-115}}+{{ :a05_1_es-22-tca-20_final.pdf |2022Eversource Transmission Cost Allocation application}} 
 + 
 + 
 +{{ ::cr-2021-025-order-of-notice.pdf |2021: order of notice}} 
 + 
 +{{ ::petition-attachments.pdf |December 2021, petition attachment, 12/2016 original date, pole heights 52'-106'}} 
 + 
 +{{ :iso_7-15-2021_no_significant_impact_of_interconnection.pdf |July 2021 no impact from interconnection}} 
 + 
 +{{ ::2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossings, no mention of pole degradation}} 
 + 
 +{{ ::e-115_and_a-111_2-15.png?linkonly |2015: "The load and added local generation in this area has not required the upgrading of either line."}}
  
 {{ ::e1115crossing.pdf |crossing}} {{ ::e1115crossing.pdf |crossing}}
  
-{{ ::e115-start-of-construction-letter.pdf |start of construction letter}} 
  
-{{ ::e115-project-maps.pdf |project maps}} 
  
 {{ :a5_webster_beebe_river_115kv_corridor_asset-conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |asset condition projects}} {{ :a5_webster_beebe_river_115kv_corridor_asset-conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |asset condition projects}}
  
-{{ :e_22018-9_115kv_pac_submissions.pdf |PAC submission}} 
  
-{{ :iso_7-15-2021_no_significant_impact_of_interconnection.pdf |July 2021 no impact from interconnection}}+ 
  
  