asset_conditions_documents
Differences
This shows you the differences between two versions of the page.
Both sides previous revision
Previous revision
|
|
asset_conditions_documents [2023/08/21 07:14] sigridundset |
asset_conditions_documents [2023/08/21 07:15] (current) sigridundset |
| |
[[https://www.puc.nh.gov/regulatory/Docketbk/2015/15-464/INITIAL%20FILING%20-%20PETITION/15-464%202015-10-19%20EVERSOURCE%20PTESTIMONY%20R%20ANDREW.PDF| "The rebuild of the X178 line did not require the acquisition of additional ROW as it was placed off center within the existing ROW, leaving space for future use of the ROW. The load in this area [and others] has not required the upgrade of the remaining sections of the X178 [and other lines]."]] | [[https://www.puc.nh.gov/regulatory/Docketbk/2015/15-464/INITIAL%20FILING%20-%20PETITION/15-464%202015-10-19%20EVERSOURCE%20PTESTIMONY%20R%20ANDREW.PDF| "The rebuild of the X178 line did not require the acquisition of additional ROW as it was placed off center within the existing ROW, leaving space for future use of the ROW. The load in this area [and others] has not required the upgrade of the remaining sections of the X178 [and other lines]."]] |
| |
{{ ::final_asset_condition_list_oct_2022.xlsx |2022 final asset condition project list}} | |
| |
{{ ::final-asset-condition-list-march-2020.xlsx |2020 final asset condition project list}} | |
| |
{{ ::final_project_list_presentation_june_2023.pdf |2023, June, final project list presentation}} | {{ ::final_project_list_presentation_june_2023.pdf |2023, June, final project list presentation}} |
asset_conditions_documents.1692598455.txt.gz ยท Last modified: 2023/08/21 07:14 by sigridundset