User Tools

Site Tools


asset_conditions_documents

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
asset_conditions_documents [2023/07/06 09:44]
sigridundset
asset_conditions_documents [2023/08/21 07:15] (current)
sigridundset
Line 1: Line 1:
 Asset Condition documents Asset Condition documents
  
-{{ :asset_condition_projects_eversource_nh.pdf |Asset condition project map 2023 March}}+[[Asset Condition Lists|Asset Condition Lists]]
  
-{{ ::eversource_nh_asset_condition_map_june.edited.png?linkonly |Asset Condition 2023 map June}} 
  
-{{ ::final_asset_condition_list_june_2023.xlsx |2023June: final asset condition project list}}+{{ ::oca_reply_brief_230818.pdf |August 182023 Office of the Consumer Advocate reply Brief DE-23-056}}
  
-{{ ::final_asset_condition_list_march_2023.xlsx |2023, March, final asset condition project list}}+{{ ::2023_07_17_nescoe_asset_condition_request_netos.pdf |July 14, 2023 NESCOE Asset Condition Request to NETOs}}
  
-{{ ::asset_condition_projects_eversource_nh.pdf |2023March: Eversource asset condition projects NH pdf}}+{{ :eversource_nh_map.edited.png?linkonly |Asset Condition map 2023 March}}
  
-{{ ::final_asset_condition_list_oct_2022.xlsx |2022 final asset condition project list}}+{{ ::eversource_nh_asset_condition_map_june.edited.png?linkonly |Asset Condition map 2023 June}} 
 + 
 +{{ ::asset_condition_projects_eversource_nh.pdf |2023, March: Eversource asset condition projects NH pdf}}
  
-{{ ::final-asset-condition-list-march-2020.xlsx |2020 final asset condition project list}}+[[https://www.puc.nh.gov/regulatory/Docketbk/2015/15-464/INITIAL%20FILING%20-%20PETITION/15-464%202015-10-19%20EVERSOURCE%20PTESTIMONY%20R%20ANDREW.PDF"The rebuild of the X178 line did not require the acquisition of additional ROW as it was placed off center within the existing ROW, leaving space for future use of the ROW. The load in this area [and others] has not required the upgrade of the remaining sections of the X178 [and other lines]."]]
  
 {{ ::final_project_list_presentation_june_2023.pdf |2023, June, final project list presentation}} {{ ::final_project_list_presentation_june_2023.pdf |2023, June, final project list presentation}}
asset_conditions_documents.1688633086.txt.gz · Last modified: 2023/07/06 09:44 by sigridundset