User Tools

Site Tools


a-152

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
a-152 [2023/08/26 09:22]
sigridundset
a-152 [2023/08/26 09:27] (current)
sigridundset
Line 2: Line 2:
  
  
-{{ ::license-granted_a152.pdf |January 2022, license granted}}+
  
 {{ ::a152:aot2120_rm.pdf |2022, March 28, DES permission to alter terrain, with waivers}} {{ ::a152:aot2120_rm.pdf |2022, March 28, DES permission to alter terrain, with waivers}}
  
-{{ :a152:aot_stamped-2.pdf |}}+{{ :a152:aot_stamped-2.pdf |2022, February 8: Stamped Alteration of Terrain plans}}
  
-{{ :a152:aot-2120_plans.pdf |}}+{{ ::license-granted_a152.pdf |January 2022, license granted}}
  
-{{ :391:aot-2120_plans.pdf |2022,January; Structure replacement and OPGW Alteration of Terrain Plans}}+{{ :391:aot-2120_plans.pdf |2022,January; Structure replacement and OPGW Alteration of Terrain and Groundwater Overlay Plans}}
  
 {{ ::a2_eversource_laminated_wood_structure_replacements_phase_2_rev1_redline.pdf |October 2021 PAC submission, laminated wood phase 2 revision 1 replace 72 out of 242 structures at $15.3 m.}} {{ ::a2_eversource_laminated_wood_structure_replacements_phase_2_rev1_redline.pdf |October 2021 PAC submission, laminated wood phase 2 revision 1 replace 72 out of 242 structures at $15.3 m.}}
a-152.1693038167.txt.gz ยท Last modified: 2023/08/26 09:22 by sigridundset