a-152 [2023/08/25 12:01]
sigridundset
a-152 [2023/08/26 09:27] (current)
sigridundset
Line 1: Line 1:
 A-152 115kV line A-152 115kV line
  
 +
 +
 +
 +{{ ::a152:aot2120_rm.pdf |2022, March 28, DES permission to alter terrain, with waivers}}
 +
 +{{ :a152:aot_stamped-2.pdf |2022, February 8: Stamped Alteration of Terrain plans}}
  
 {{ ::license-granted_a152.pdf |January 2022, license granted}} {{ ::license-granted_a152.pdf |January 2022, license granted}}
  
-{{ :391:aot-2120_plans.pdf |2022,January; Structure replacement and OPGW Alteration of Terrain Plans}}+{{ :391:aot-2120_plans.pdf |2022,January; Structure replacement and OPGW Alteration of Terrain and Groundwater Overlay Plans}}
  
 {{ ::a2_eversource_laminated_wood_structure_replacements_phase_2_rev1_redline.pdf |October 2021 PAC submission, laminated wood phase 2 revision 1 replace 72 out of 242 structures at $15.3 m.}} {{ ::a2_eversource_laminated_wood_structure_replacements_phase_2_rev1_redline.pdf |October 2021 PAC submission, laminated wood phase 2 revision 1 replace 72 out of 242 structures at $15.3 m.}}
Line 11: Line 17:
  
 {{ ::staff_recommendation.pdf |December 2021 staff recommendation,steel poles 65'-79'}} {{ ::staff_recommendation.pdf |December 2021 staff recommendation,steel poles 65'-79'}}
- 
-{{ :391:aot-2120_plans.pdf |}} 
- 
-{{ :391:aot2210_rm.pdf |}} 
- 
-{{ :391:aot-2210_plans.pdf |}} 
  
 {{ ::crossing_petition.pdf |November 2021 crossing petition, wood to steel}} {{ ::crossing_petition.pdf |November 2021 crossing petition, wood to steel}}