Differences
This shows you the differences between two versions of the page.
Both sides previous revision
Previous revision
Next revision
|
Previous revision
|
a-152 [2023/08/21 08:12] sigridundset |
a-152 [2023/08/26 09:27] (current) sigridundset |
A-152 115kV line | A-152 115kV line |
| |
| |
| |
| |
| {{ ::a152:aot2120_rm.pdf |2022, March 28, DES permission to alter terrain, with waivers}} |
| |
| {{ :a152:aot_stamped-2.pdf |2022, February 8: Stamped Alteration of Terrain plans}} |
| |
{{ ::license-granted_a152.pdf |January 2022, license granted}} | {{ ::license-granted_a152.pdf |January 2022, license granted}} |
| |
| {{ :391:aot-2120_plans.pdf |2022,January; Structure replacement and OPGW Alteration of Terrain and Groundwater Overlay Plans}} |
| |
{{ ::a2_eversource_laminated_wood_structure_replacements_phase_2_rev1_redline.pdf |October 2021 PAC submission, laminated wood phase 2 revision 1 replace 72 out of 242 structures at $15.3 m.}} | {{ ::a2_eversource_laminated_wood_structure_replacements_phase_2_rev1_redline.pdf |October 2021 PAC submission, laminated wood phase 2 revision 1 replace 72 out of 242 structures at $15.3 m.}} |