Previous revision
a-126 [2023/08/26 08:56]
sigridundset
a-126 [2023/08/27 10:45] (current)
sigridundset
Line 1: Line 1:
 ====== A-126 115kV line ====== ====== A-126 115kV line ======
  
-{{ ::a126:aot-2412_miscellaneous_r.pdf |2023, May 5: cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."}}+
  
 {{ :a126:aot-2412_permit_rm.pdf |2023, June 27: Alteration of Terrain permit with waivers}} {{ :a126:aot-2412_permit_rm.pdf |2023, June 27: Alteration of Terrain permit with waivers}}
  
 {{ :a126:aot-2412_plans.pdf |2023, June 16: Alteration of Terrain plans}} {{ :a126:aot-2412_plans.pdf |2023, June 16: Alteration of Terrain plans}}
 +
 +{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}
  
 {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 35 out of 182 structures; $8.4 million}} {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 35 out of 182 structures; $8.4 million}}
  
 {{ ::2023_05_18_meeting_minutes_final.pdf |2023 may 18 PAC minutes}} {{ ::2023_05_18_meeting_minutes_final.pdf |2023 may 18 PAC minutes}}
 +
 +{{ ::a126:aot-2412_miscellaneous_r.pdf |2023, May 5: cover letter for Alteration of Terrain application. "The proposed project includes the replacement of 76 existing utility structures on the R193, A126, and H141 transmission lines that must be replaced because they have reached the end of their service life."}}
  
 {{ ::oct_17_2018_seven_115kv_asset_conditions_lines_partial.pdf |2018, October 17, presentation to PAC, replace 49 structures, $8.3 million}} {{ ::oct_17_2018_seven_115kv_asset_conditions_lines_partial.pdf |2018, October 17, presentation to PAC, replace 49 structures, $8.3 million}}
a-126.1693036615.txt.gz · Last modified: 2023/08/26 08:56 by sigridundset