User Tools

Site Tools


a-111

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
a-111 [2023/08/26 08:50]
sigridundset
a-111 [2023/08/26 08:53] (current)
sigridundset
Line 13: Line 13:
 {{ ::e-115_and_a-111_2-15.png?linkonly |2015: "The load and added local generation in this area has not required the upgrading of either line."}} {{ ::e-115_and_a-111_2-15.png?linkonly |2015: "The load and added local generation in this area has not required the upgrading of either line."}}
  
-{{ ::a05_1_es-21-tca-44_final.pdf |Final TCA, $33. m.}} +{{ ::a05_1_es-21-tca-44_final.pdf |2021, August 19; Final TCA, $33. m.}}
- +
-{{ ::a05_1_es-23-tca-01_final.pdf |Final TCA Z-180}}+
  
 {{ ::a5_webster_beebe_river_115kv_corridor_asset-conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |October 2019 PAC presentation. A-111 listed as Asset Condition, not reliability project.}} {{ ::a5_webster_beebe_river_115kv_corridor_asset-conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |October 2019 PAC presentation. A-111 listed as Asset Condition, not reliability project.}}
Line 38: Line 36:
  
 {{ ::staff_recommend.pdf |December 2021, staff recommendation}} {{ ::staff_recommend.pdf |December 2021, staff recommendation}}
- 
-{{ ::a126:aot-2412_miscellaneous_r.pdf |Alteration of Terrain}} 
- 
-{{ :a126:aot-2412_permit_rm.pdf |Alteration of Terrain permit}} 
- 
-{{ :a126:aot-2412_plans.pdf |Alteration of Terrain plans}} 
  
 {{ ::2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossings, no mention of pole degradation}} {{ ::2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossings, no mention of pole degradation}}
  
  
a-111.1693036206.txt.gz · Last modified: 2023/08/26 08:50 by sigridundset