User Tools

Site Tools


a-111

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
a-111 [2023/08/19 08:43]
sigridundset
a-111 [2023/08/26 08:53] (current)
sigridundset
Line 1: Line 1:
 ====== A-111 115kV transmission line ====== ====== A-111 115kV transmission line ======
  
-{{ :a-111_long_road.png?linkonly |Long road}} 
  
-{{ ::a-111_wetland_matting.jpeg?linkonly |Wetland matting}} 
- 
-{{ ::a-111_sign.jpeg?linkonly |Stay away sign}} 
- 
-{{ ::a-111_road_road.jpeg?linkonly |Road and wetlands matting on ROW and new structures, conductor and OPGW}} 
- 
-{{ ::a-111_pole_and_water.jpeg?linkonly |New pole in water}} 
- 
-{{ ::a-111_new_hampton.jpeg?linkonly |Large truck hauling flatbed on wetland matting and road in ROW.}} 
- 
-{{ ::a-111_embedded_pole.jpeg?linkonly |Two new poles in water}} 
- 
-{{ ::a-111_bulldozer.jpeg?linkonly |Excavator, gravel truck and other heavy machinery on ROW}} 
  
 {{ ::a05_1_es-21-tca-44_final.pdf |Application to ISO for TCA. Rebuilding line at the same size is not presented as an alternative. No pole inspections submitted. Described as reliability and asset condition project}} {{ ::a05_1_es-21-tca-44_final.pdf |Application to ISO for TCA. Rebuilding line at the same size is not presented as an alternative. No pole inspections submitted. Described as reliability and asset condition project}}
Line 24: Line 10:
  
 {{ ::a111-project-construction-factsheet.pdf |Project construction fact sheet citing reliability}} {{ ::a111-project-construction-factsheet.pdf |Project construction fact sheet citing reliability}}
- 
-{{ ::2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossings, no mention of pole degradation}} 
  
 {{ ::e-115_and_a-111_2-15.png?linkonly |2015: "The load and added local generation in this area has not required the upgrading of either line."}} {{ ::e-115_and_a-111_2-15.png?linkonly |2015: "The load and added local generation in this area has not required the upgrading of either line."}}
  
-{{ ::a05_1_es-21-tca-44_final.pdf |Final TCA, $33. m.}} +{{ ::a05_1_es-21-tca-44_final.pdf |2021, August 19; Final TCA, $33. m.}}
- +
-{{ ::a05_1_es-23-tca-01_final.pdf |Final TCA Z-180}}+
  
 {{ ::a5_webster_beebe_river_115kv_corridor_asset-conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |October 2019 PAC presentation. A-111 listed as Asset Condition, not reliability project.}} {{ ::a5_webster_beebe_river_115kv_corridor_asset-conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |October 2019 PAC presentation. A-111 listed as Asset Condition, not reliability project.}}
Line 54: Line 36:
  
 {{ ::staff_recommend.pdf |December 2021, staff recommendation}} {{ ::staff_recommend.pdf |December 2021, staff recommendation}}
 +
 +{{ ::2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossings, no mention of pole degradation}}
  
  
a-111.1692431029.txt.gz · Last modified: 2023/08/19 08:43 by sigridundset