====== A-111 115kV transmission line ====== | ====== A-111 115kV transmission line ====== |
| |
{{ :a-111_long_road.png?linkonly |Long road}} | |
| |
{{ ::a-111_wetland_matting.jpeg?linkonly |Wetland matting}} | |
| |
{{ ::a-111_sign.jpeg?linkonly |Stay away sign}} | |
| |
{{ ::a-111_road_road.jpeg?linkonly |Road and wetlands matting on ROW and new structures, conductor and OPGW}} | |
| |
{{ ::a-111_pole_and_water.jpeg?linkonly |New pole in water}} | |
| |
{{ ::a-111_new_hampton.jpeg?linkonly |Large truck hauling flatbed on wetland matting and road in ROW.}} | |
| |
{{ ::a-111_embedded_pole.jpeg?linkonly |Two new poles in water}} | |
| |
{{ ::a-111_bulldozer.jpeg?linkonly |Excavator, gravel truck and other heavy machinery on ROW}} | |
| |
{{ ::a05_1_es-21-tca-44_final.pdf |Application to ISO for TCA. Rebuilding line at the same size is not presented as an alternative. No pole inspections submitted. Described as reliability and asset condition project}} | {{ ::a05_1_es-21-tca-44_final.pdf |Application to ISO for TCA. Rebuilding line at the same size is not presented as an alternative. No pole inspections submitted. Described as reliability and asset condition project}} |
| |
{{ ::a111-project-construction-factsheet.pdf |Project construction fact sheet citing reliability}} | {{ ::a111-project-construction-factsheet.pdf |Project construction fact sheet citing reliability}} |
| |
{{ ::2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossings, no mention of pole degradation}} | |
| |
{{ ::e-115_and_a-111_2-15.png?linkonly |2015: "The load and added local generation in this area has not required the upgrading of either line."}} | {{ ::e-115_and_a-111_2-15.png?linkonly |2015: "The load and added local generation in this area has not required the upgrading of either line."}} |
| |
{{ ::a05_1_es-21-tca-44_final.pdf |Final TCA, $33. m.}} | {{ ::a05_1_es-21-tca-44_final.pdf |2021, August 19; Final TCA, $33. m.}} |
| |
{{ ::a05_1_es-23-tca-01_final.pdf |Final TCA Z-180}} | |
| |
{{ ::a5_webster_beebe_river_115kv_corridor_asset-conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |October 2019 PAC presentation. A-111 listed as Asset Condition, not reliability project.}} | {{ ::a5_webster_beebe_river_115kv_corridor_asset-conditions_and_opgw_project_lines_a111_e115_z180_rev1_clean.pdf |October 2019 PAC presentation. A-111 listed as Asset Condition, not reliability project.}} |
| |
{{ ::staff_recommend.pdf |December 2021, staff recommendation}} | {{ ::staff_recommend.pdf |December 2021, staff recommendation}} |
| |
| {{ ::2017_river_crossings_existing_poles_and_wires_just_fine.pdf |2017 river crossings, no mention of pole degradation}} |
| |
| |