391 [2023/08/25 12:20]
sigridundset
391 [2023/08/27 10:43] (current)
sigridundset
Line 1: Line 1:
 391 345kV Line 391 345kV Line
 +
 +{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}
  
 {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 39 out of 335 structures; $12.4 million}} {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 39 out of 335 structures; $12.4 million}}
Line 5: Line 7:
 {{ :391:aot2210_rm.pdf |2022, August 19; Alteration of Terrain DES approval and waiver letter 391, 373, 385}} {{ :391:aot2210_rm.pdf |2022, August 19; Alteration of Terrain DES approval and waiver letter 391, 373, 385}}
  
-{{ :a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf |2022, June 15 presentation to PAC, rreplace 27 out of 345 poles; $9. million}}+{{ :a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf |2022, June 15 presentation to PAC, replace 27 out of 345 poles; $9. million for 391 line}}
  
-{{ :391:aot_2210_miscellaneous_r.pdf |}}+{{ :391:aot_2210_miscellaneous_r.pdf |2022, June 1; Alteration of Terrain application 391 line.}}
  
 {{ :391:fig_4_-_391_385_373_2022_aot_plans_041522_compiled.pdf |2022, April, Alteration of Terrain Plans, 391, 373, 385}} {{ :391:fig_4_-_391_385_373_2022_aot_plans_041522_compiled.pdf |2022, April, Alteration of Terrain Plans, 391, 373, 385}}
391.1692962401.txt.gz · Last modified: 2023/08/25 12:20 by sigridundset