User Tools

Site Tools


391

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
391 [2023/08/25 12:13]
sigridundset
391 [2023/08/27 10:43] (current)
sigridundset
Line 1: Line 1:
 391 345kV Line 391 345kV Line
 +
 +{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}
  
 {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 39 out of 335 structures; $12.4 million}} {{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 39 out of 335 structures; $12.4 million}}
Line 5: Line 7:
 {{ :391:aot2210_rm.pdf |2022, August 19; Alteration of Terrain DES approval and waiver letter 391, 373, 385}} {{ :391:aot2210_rm.pdf |2022, August 19; Alteration of Terrain DES approval and waiver letter 391, 373, 385}}
  
-{{ :a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf |2022, June 15 presentation to PAC, rreplace 27 out of 345 poles; $9. million}}+{{ :a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf |2022, June 15 presentation to PAC, replace 27 out of 345 poles; $9. million for 391 line}}
  
 +{{ :391:aot_2210_miscellaneous_r.pdf |2022, June 1; Alteration of Terrain application 391 line.}}
 +
 +{{ :391:fig_4_-_391_385_373_2022_aot_plans_041522_compiled.pdf |2022, April, Alteration of Terrain Plans, 391, 373, 385}}
  
 {{ :391:aot-2210_plans.pdf |2022, May; Alteration of Terrain drawings, 391, 373, 385}} {{ :391:aot-2210_plans.pdf |2022, May; Alteration of Terrain drawings, 391, 373, 385}}
- 
-{{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017, December presentation to PAC, replacement of 69 out of 335 poles; $19.6 million}} 
  
 {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}} {{ :may_18_2023_e_pac_lines_map.png?linkonly |map showing line location}}
Line 19: Line 22:
  
 {{ ::delineated_wetland_under_391_line.jpg?linkonly |delineated wetland under 391, "upgrade"}} {{ ::delineated_wetland_under_391_line.jpg?linkonly |delineated wetland under 391, "upgrade"}}
 +
 +{{ :391:aot-1781_plans.pdf |2020, January 20; Surface and Groundwater overlay plans}}
 +
 +{{ :391:aot-1781_start_of_construction.pdf |2020: Start of Construction form}}
 +
 +{{ :391:aot1781_rm.pdf |2020, April 3; DES permission to Alter the Terrain, with waivers}}
  
 {{ :391:aot-1632_start_of_construction.pdf |2019, July 1 Start of Construction form}} {{ :391:aot-1632_start_of_construction.pdf |2019, July 1 Start of Construction form}}
Line 28: Line 37:
 {{ :391:aot-1632_plans.pdf |2019, April 24; Alteration of Terrain plans for structure replacements 391, 373, 385}} {{ :391:aot-1632_plans.pdf |2019, April 24; Alteration of Terrain plans for structure replacements 391, 373, 385}}
  
-{{ :391:aot1781_rm.pdf |}} +{{ ::a9_eversource_345kv_structure_replacement_projects.pdf |2017, December presentation to PAC, replacement of 69 out of 335 poles; $19.6 million}}
- +
-{{ :391:aot-1781_plans.pdf |}} +
- +
-{{ :391:aot-1781_start_of_construction.pdf |}}+
  
-{{ :391:aot-1781_plans.pdf |}} 
  
-{{ :391:aot-1781_start_of_construction.pdf |}} 
  
-{{ :391:aot_2210_miscellaneous_r.pdf |}} 
  
-{{ :391:fig_4_-_391_385_373_2022_aot_plans_041522_compiled.pdf |}} 
  
  
391.1692962004.txt.gz · Last modified: 2023/08/25 12:13 by sigridundset