User Tools

Site Tools


373

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
373 [2023/06/15 08:09]
sigridundset
373 [2023/08/27 10:44] (current)
sigridundset
Line 1: Line 1:
 373 345kV Line 373 345kV Line
  
-{{ :a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf |}}+{{ ::391:2023_05_18_meeting_minutes_final.pdf |2023, May 18 PAC minutes "A stakeholder suggested the ISO could take an “if you build it, they will come approach” but another stakeholder raised concern that this could be “building a bridge to nowhere.” "}}
  
-{{ ::373_2018.pdf |}}+{{ ::a04_2023_05_28_pac_nh_wood_structure_and_opgw_installations.pdf |2023, May 18, presentation to PAC, replace 34 out of 178 structures; $10.3 million}}
  
-{{ ::09232020_m.pdf |}}+{{ :a3_eversource_new_hampshire_asset_conditions_wood_structure_replacement.pdf |2022, June 15 report to PAC, replace 25 out of 169 structures; $8.6 m}}
  
-{{ ::de-20-033.pdf |}}+{{ ::a4_eversource_345kv_structure_replacement_2020_2021.pdf |2021 presentation to PAC, 22 structures out of 178 replaced, $9.8 m}} 
 + 
 +{{ ::373_2018.pdf |2018 article on maintenance work, not described}} 
 + 
 +{{ ::09232020_m.pdf |2020, September 23, Deerfield Plann{{ :373:aot-1632_start_of_construction.pdf |}}{{ :373:aot-1632_miscellaneous_r.pdf |}}ing Board minutes}} 
 + 
 +{{ ::de-20-033.pdf |2020, }} 
 + 
 +{{ ::373:aot1632_rm.pdf |Alteration of Terrain}} 
 + 
 +{{ :373:aot1781_rm.pdf |Alteration of Terrain}} 
 + 
 +{{ :373:aot2210_rm.pdf |Alteration of Terrain}}
  
 {{ ::de-20-195-order-26-468.pdf |}} {{ ::de-20-195-order-26-468.pdf |}}
  
  
373.1686812998.txt.gz · Last modified: 2023/06/15 08:09 by sigridundset