User Tools

Site Tools


12-16-2021:arcand

Differences

This shows you the differences between two versions of the page.

Link to this comparison view

Both sides previous revision Previous revision
Next revision
Previous revision
12-16-2021:arcand [2022/01/23 14:50]
sigridundset
12-16-2021:arcand [2022/02/03 11:20] (current)
sigridundset
Line 1: Line 1:
  
-====== Batch +====== Batch ======
- ======+
  
-{{ ::arcand:2016-5-5_ohrv_xing_policy_final.pdf |May 5, 2016 DOT Commissioner Declaratory Ruling re RSA-A:9 governing OHRV trail crossings withing class I,II,and III highway rights-of-way.}}+{{:arcand:arcand_work_order_closed.jpg?linkonly|November 6, 2020: OHRV trails crossing roads}} 
 + 
 +{{ :arcand:claremont_waiver_msg.jpg?linkonly |July 8, 2016: DOT email re Claremont and FHWA.}} 
 +  
 + 
 +{{ ::arcand:2016-5-5_ohrv_xing_policy_final.pdf |May 5, 2016 DOT Commissioner Declaratory Ruling re RSA-A:9 governing OHRV trail crossings within class I,II,and III highway rights-of-way.}}
  
 {{ :arcand:2019_permits_signed.pdf |July 9, 2019 DOT permit for crossing of Hughes Rd.,/Route 145}} {{ :arcand:2019_permits_signed.pdf |July 9, 2019 DOT permit for crossing of Hughes Rd.,/Route 145}}
Line 30: Line 34:
 {{:arcand:jericho_connector_rte_110_paving_0519.jpg?linkonly|May, 2019: Jericho Connector route 110 paving for OHRV}} {{:arcand:jericho_connector_rte_110_paving_0519.jpg?linkonly|May, 2019: Jericho Connector route 110 paving for OHRV}}
  
-{{:arcand:nhdot_claremont_letter_070816.pdfJuly 8, 2016; NH DOT Claremont letter|}}+{{:arcand:nhdot_claremont_letter_070816.pdf|July 8, 2016; NH DOT Claremont letter}}
  
 {{:arcand:nhdot_haverhill_letter_071416_final.pdf|July 14, 2016, Haverhill letter, final}} {{:arcand:nhdot_haverhill_letter_071416_final.pdf|July 14, 2016, Haverhill letter, final}}
Line 54: Line 58:
 {{:arcand:re_fw_crossings_in_pittsburg_redacted_pi.pdf|July 26, 2019: DOT; "we did have one OHRV trail crossing in Pittsburg on US-3 that was revoked late last year. The permit and relevant correspondences is attached. With regard to the NH-145 “crossing”, we did not issue any crossings in Colebrook on NH-145. However, we did issue On-highway connector permits for NH-145 and US-3. A copy of those permits is attached."}} {{:arcand:re_fw_crossings_in_pittsburg_redacted_pi.pdf|July 26, 2019: DOT; "we did have one OHRV trail crossing in Pittsburg on US-3 that was revoked late last year. The permit and relevant correspondences is attached. With regard to the NH-145 “crossing”, we did not issue any crossings in Colebrook on NH-145. However, we did issue On-highway connector permits for NH-145 and US-3. A copy of those permits is attached."}}
  
-{{:arcand:re_rail_trail_crossing_in_haverhill.pdf|}}+{{:arcand:re_rail_trail_crossing_in_haverhill.pdf|August 17, 2016: Request for information on permitting a driveway crossing of the Blackmount (Haverhill) Rail Trail.}}
  
-{{:arcand:re_request_for_records_rsa_91a_redacted_pi.pdf|}}+{{:arcand:re_request_for_records_rsa_91a_redacted_pi.pdf|October 19, 2020: request for response to 91-a: "all documents, no matter what form, including but not limited to, printed documents, electronic documents, e-mails, or any other form of documents regarding modifying, re-routing or building of ATV/OHRV Trails in Colebrook for the period from 03/15/2019 to 10/15/2020. Looking for any correspondence in writing, email or phone calls between NHDOT, NHDOS, NHDCR, the Town of Colebrook Select Board or Town Manager, The Metallak ATV Club concerning the modifying, re-locating, design or building of ATV/OHRV trails in Colebrook for this year or projects being discussed for next year. "}}
  
-{{:arcand:re_rsa_91-a_request_for_crossing_info_redacted_pi.pdf|}}+{{:arcand:re_rsa_91-a_request_for_crossing_info_redacted_pi.pdf|August 20, 2019: follow up on 91-a; "Thank you. I think there are a few things outstanding still. I believe there were three crossings in Pittsburg that 
 +were closed. This only captures one of them. Is that not the case? Please also include any and all rationale provided for the other two closings, and if relevant, reopenings. Also, I had requested any record of DOT's evaluation of comments and input regarding safety and the Colebrook 145 crossing. Finally, please include any evaluation or discussion of DOT directives in relation to the Colebrook 145 crossing.."}}
  
-{{ :arcand:yamaha_trail_north_side_rwts_0519.jpg?linkonly |}}+{{ :arcand:yamaha_trail_north_side_rwts_0519.jpg?linkonly |May 2019: Yamaha Trail north side paving.}}
  
-{{ :arcand:yamaha_trail_south_side_paving_0519.jpg?linkonly |}}+{{ :arcand:yamaha_trail_south_side_paving_0519.jpg?linkonly |Yamaha Trail south side paving.}}
  
12-16-2021/arcand.1642949444.txt.gz · Last modified: 2022/01/23 14:50 by sigridundset